docs: record Forgejo prune recovery evidence
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 2s

Assistant: codex
Assistant-Model: gpt-5.6-sol
Assistant-Session: 01a06bfe-2a55-7ed3-bacd-879977b099bf
This commit is contained in:
tegwick 2026-09-04 20:02:44 +02:00
parent 7fb3db6666
commit 47ed0a280b

View file

@ -9,7 +9,7 @@ owner: codex
topic_slug: activity-core
priority: high
created: "2026-08-23"
updated: "2026-08-23"
updated: "2026-09-04"
quality_dor: DoR-Ok
quality_dor_at: "2026-08-23"
quality_dor_by: codex
@ -325,6 +325,29 @@ Depends on T02T07 as applicable.
Natural post-rollout operation evidence remains open: CNPG and SBOM next run
2026-08-24; Forgejo prune next run 2026-08-30. No schedule was manually fired.
## Production evidence follow-up — 2026-09-04
- The read-only and two of three bounded-operation classes have natural
post-rollout evidence. Daily CNPG backup is healthy through 2026-09-04
(`run_id=da76a381-af99-5c91-ab7f-6df9ed89e710`, four dumped/uploaded,
zero failed). Daily SBOM catch-up completed its controlled 2026-08-24 fire
(`run_id=4c4594ad-366b-5720-b3f9-44fb300fda70`, three frozen references,
State Hub progress `f62eaadd-d10c-4a21-8547-293569ed5637`).
- The 2026-08-30 Forgejo prune schedule did fire naturally, but failed closed
before mutation because its required hostPath inventory
`docs/evidence/live-images-all.txt` was absent after the platform checkout
changed. No packages were deleted and no progress evidence was emitted for
the rejected run.
- Rebuilt the railiance01 inventory on 2026-09-04 and merged the preserved
coulombcore export. The worker now sees 51 non-empty lines with SHA-256
`ceb53015d130e205314892262d331925fb3fa6c88d9429da65189b432566296a`.
A read-only prune dry-run returned zero errors and zero deletions, admitted
22 protected package versions, and explicitly skipped both protected
State Hub tags (`f2e042a`, `main-1cf949b`).
- Temporal reports the schedule enabled and unpaused. T08 remains `progress`
until the next natural apply fire (2026-09-06 03:30 UTC) produces successful
State Hub evidence; the schedule was not manually fired.
## Gap disposition
| 2026-08-23 gap | This workplan |