# ACTIVITY-WP-0036 Queue Boundary Rollout — 2026-08-23 ## Source verification - Revision: `f0a897e` (`Harden ops run identity and leases`), pushed to `origin/main`. - Tests: 468 passed, 1 skipped (the live integration-stack test). - Python compilation and `git diff --check`: passed. - Railiance manifest: all 16 YAML documents parsed; runtime ConfigMap contains `ACTIVITY_CORE_WORKER_ID=rein-aharness@railiance01`. ## Production rollout - Built and imported `activity-core:railiance01-prod` with OCI index digest `sha256:06442e86a7d5358251554fffb799a06709b694f21431ddefa74b5f8a672dfcd9`. - Applied the runtime ConfigMap and restarted only `deployment/actcore-api`. - Ready pod `actcore-api-8799c6944-hsn74` runs config/image id `sha256:e6e9f0171e36ce0f50a970435ea55f10d428f1743050d1629a94ff4fd19cec37`. - The worker-token Secret key was checked for non-empty presence without reading or printing its value. The API reports the bound non-secret identity `rein-aharness@railiance01`. ## Live boundary evidence - The existing `rein-aharness-claim-loop.service` remained active. Its first two polls after rollout were authenticated `POST /ops-runs/claim` responses with HTTP 200 at `11:05:04Z` and `11:05:34Z`. - A request carrying the valid worker credential but body `worker_id=spoofed-worker` was rejected with HTTP 403 and `worker_id does not match authenticated worker` before queue access. - Authenticated status showed 0 claimed, 1 open, 23 succeeded, and 20 failed rows. The sole open row is an intentionally non-automated 2026-08-17 retention-closeout record, so it was not claimed or changed for this proof. - No schedule was fired and no production `ops_run` state was manufactured. ## Residual acceptance evidence The server-side missing/equal/expired lease behavior is covered deterministically in the passing suite, including row-lock acquisition and no mutation on rejection. No run was actively leased during the rollout window, so a natural production heartbeat plus a rejected late close remains the final T04 evidence. This does not weaken the deployed enforcement; it avoids changing unrelated production work solely to create a demonstration row.