Point residual and ops-sso-access design at the file-backed work records in net-kingdom rather than informal coordination notes. |
||
|---|---|---|
| .. | ||
| adr | ||
| conventions.md | ||
| idempotency.md | ||
| issue-core-emission-boundary.md | ||
| ops-sso-access.md | ||
| runbook.md | ||
| task-emission-consumer-contract.md | ||