Record GH-DEC-2026-005; strike the spent G3 revisit trigger
Gate House confirmed all three requested dispositions as GH-DEC-2026-005 (GH-IN-0002, closed); flex-auth accepted as FLEX-DEC-2026-006. The approval-claim is the step-1 artifact, ActionAuthorization is not required and MUST NOT be served from the claim endpoint, and a PEP validates across the claim and the step-2 DecisionEnvelope. Gate House recorded the split as doctrine rather than convenience -- a PIP must not republish the PDP's decision -- and struck the provenance.authority == state-hub requirement explicitly. This engine's claim schema is unchanged. Correct the deferred option D trigger list. The G3 trigger was written conditional on G3 being settled by composition; flex-auth reports FLEX-WP-0019 closed it by adding a lifetime field to DecisionEnvelope on 2026-09-02, so a decision now states its own end without borrowing ActionAuthorizationValidity. That was the one structural thing the bundle did that the split does not, so the trigger is not merely spent -- it resolved against ratification. Struck with reasons; a future revisit needs a fresh argument. The trigger came from a stale row in a dated 2026-08-29 review record that flex-auth does not rewrite. Also record the root cause of the bad authority constant: it came from a flex-auth fixture, not prose. A contract whose examples contradict its prose will be implemented as its examples. Close APPROVAL-IN-0002. Docs only; 84 tests pass. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01TvyJPAaVCGsVheVhcCwNND Assistant: claude-code Assistant-Model: opus Assistant-Process: 411227@bnt-lap001 Assistant-Session: d566f6d3-bcaf-43c3-bc5e-3ddd0f64b535
This commit is contained in:
parent
54ced98b84
commit
564534dbcb
4 changed files with 61 additions and 8 deletions
|
|
@ -197,3 +197,17 @@ governed approval-claim (`approval_id`, `state`/`valid_now`, `binding`,
|
|||
rather than a version error. Recorded in `docs/approval-consumption.md`;
|
||||
reconciling the envelopes is a `GH-DEC-2026-003` cross-repo change, not a
|
||||
unilateral edit here. T05 stays `wait`: still no deployed base URL (T03).
|
||||
|
||||
2026-09-06 ruling: the claim-envelope question is settled. `GH-DEC-2026-005`
|
||||
confirms all three requested dispositions — the approval-claim is the step-1
|
||||
artifact, `ActionAuthorization` is not required and MUST NOT be served from the
|
||||
claim endpoint, and a PEP validates across the claim and the step-2
|
||||
`DecisionEnvelope`. Gate House recorded the split as doctrine (a PIP must not
|
||||
republish the PDP's decision) and struck the `provenance.authority ==
|
||||
"state-hub"` requirement explicitly. flex-auth accepted as `FLEX-DEC-2026-006`,
|
||||
argued against its own proposal, and traced the bad authority constant to a
|
||||
fixture rather than prose. **This engine changes nothing: the claim schema
|
||||
stands as published.** `APPROVAL-IN-0002` is closed. T05 remains `wait` on T03
|
||||
deployment plus the secrets-engine validator split and its
|
||||
`secrets-engine-approval` KeyCape registration (already requested verbatim in
|
||||
`docs/keycape-service-registrations.md`).
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue