# Office-Hour Command Day — Sunday 2026-08-16, afternoon (scheduled) > First command day of the reactivation. **Scheduled 2026-08-16 afternoon.** > The original "first two weeks of August" window lapsed at 0/5 drained. > All items sourced from OK Audit v0 findings (`audits/OK-Audit-v0-binky.md`). ## Sunday constraint — read before starting This is a **Sunday**. Four of the five items are self-service digital and work fine (DUO, Qonto, handelsregister.de, Stripe). **OH-2026-001 does not** — the Bohle-Horsmann office is closed and the phone (03843-72110) is not an option today. Consequence: **001 gets dispatched today, not resolved today.** Send the email *first*, so it is at the top of Inga's inbox Monday morning rather than behind a weekend backlog; then spend the rest of the afternoon on the four items that do close. RISK-006 therefore **cannot** leave "unmitigated" today — it moves to "awaiting counterparty reply", with a follow-up call slot on **Tue 2026-08-18** if nothing has come back by then. Realistic outcome of this day: **4/5 closed, 001 dispatched.** ## Must do today 1. **OH-2026-001 — Email Inga Bohle-Horsmann FIRST** (horsmann@bohle-horsmann.de; phone 03843-72110 unusable today): does she take the mandate? - Reply into the existing 2026-07-06 thread rather than opening a new one — she already has the JA 2024 PDF from it. - State the scope in the mail so a yes is a complete yes: JA 2025 + ongoing filings, "notify me when something is due" mode, DUO takeover accompanied by Weglarzy. Ask for a yes/no plus an earliest-start date. - If no (or no reply by **Tue 2026-08-18**): fallback decision — re-engage Weglarzy/FSW (06151-…, Landwehrstr. 54, Darmstadt) or search alternative. - Mark OH-2026-001 `dispatched`, not `done`. It closes when she replies. 2. **OH-2026-002 — DUO Belegablage**: log in, assess receipt backlog size, photograph/upload missing receipts. Note: *confirming access continuity through the mandate transition* depends on 001 and is deferred with it — size and clear the backlog today regardless, since that work is needed under any StB outcome. 3. **OH-2026-003 — Qonto** (DEC-2026-004 approved — **also Red-lane provision**): - Verify dashboard access works. - Note plan tier + monthly fee → `finance/CostRunRate.md` row 4. - Note cheaper plan options (plan *change* itself can wait — data only). - **Provision API key for MCP (unblocks BINKY-WP-0005-T05):** 1. `/settings/integrations` → create API key; note organization ID. 2. Private terminal only (never chat/agent): ```bash umask 077 # key → /tmp/qonto.key, org id → /tmp/qonto.org bao kv put tenants/binky/qonto/api \ QONTO_API_KEY=@/tmp/qonto.key \ QONTO_ORGANIZATION_ID=@/tmp/qonto.org shred -u /tmp/qonto.key /tmp/qonto.org ``` 3. Full procedure: `integrations/qonto-mcp.md` (OH/T05 runbook). 4. After provision: agent runs first read-only pull + CostRunRate update. 4. **OH-2026-004 — Handelsregister**: pull current HR excerpt (handelsregister.de), verify registered address and GF details, download articles of association if retrievable; file everything in `2binky/`. Full prep (free retrieval path, the four fields to verify, filing rule, Orange/Red boundary) is in `OfficeHourQueue.md` under OH-2026-004. 5. **OH-2026-005 — Stripe webhook cleanup**: Dashboard → Developers → Webhooks → delete the stale `api.preprod.blobr.dev` endpoint; while there, list remaining endpoints and confirm which are live. ## Suggested order for a Sunday afternoon 1. **001 email** (~15 min) — send first, it needs to sit in an inbox overnight 2. **005** (5–10 min) — clears the monthly failure-digest noise 3. **004** (15–25 min) — register pull, independent of the StB question 4. **003** (30–45 min) — Qonto review + API provision (private terminal) 5. **002** (open-ended) — DUO backlog; the item most likely to overrun, so it goes last and can be truncated without blocking anything else ## Prepared material - `audits/OK-Audit-v0-binky.md` — one-page situation summary for any call - Inquiry email thread 2026-07-06 (`~/2binky/260706a-mandatsanfrageIngaBohle/`) - JA 2024 report PDF (same folder) — already shared with Inga - Talking points for the StB contact (now an email, see item 1): small mandate, JA + formal filings, proactive deadline notification wanted, DUO takeover accompanied by Weglarzy ## Do not spend time on - internal documentation, repo cleanup, speculative naming - Qonto plan *change* (data gathering only — change is a separate Red-lane step) - website/domain decisions (queued as AWQ-003/AWQ-005, not office-hour work) ## After the day Update OfficeHourQueue item statuses, RiskRegister (RISK-006/007), and the CompanyReactivationPlan checklist; write the daily brief. Then update the project-side tracker `prj-unattended-progress-company/evidence/g1-oh-batch.md` (UPC-WP-0002-T01) and the G1/G8 rows in `architecture/gate-map.md` (T02). With 001 still open, the S1 decision package (`evidence/s1-decision-package.md`) stays draft — S1 is not markable until the StB mandate question has an answer. **Open follow-up after the day:** Tue 2026-08-18 — if Inga has not replied, call 03843-72110 or trigger the Weglarzy/FSW fallback.