CB-WP-0005 T03: correct the record, and defer Phase C
Four verdicts in evidence/CB-EV-0001 corrected in place with a dated note, per ADR-0005 §4: AM-7 replay split (timing met, hash-identical withdrawn), AM-10 withdrawn as written and restated as AM-10' (the K6 determinism lint it actually measured), AM-11 downgraded to unmet, and AM-1b added to the scoreboard it was missing from. The scoreboard gains an Enforced column carrying M-D1-MUT, because a row can be measured and still enforce nothing and the table had no way to say so. AM-6 now reads "met, 16.5x" alongside "not enforced — nothing compares any number to 100,000". A fifth correction surfaced that ADR-0005 did not list: AM-12 still read $248.46, the figure CB-WP-0002 disproved and corrected to $93.15 four workplans ago. It was stale in the evidence file ever since — untagged, and therefore invisible to facts-check. Now tagged. A duplicated-fact instance that survived the gate built to catch duplicated facts, because that gate only checks copies that opted in. Recorded for T07. GameKernel §5 carries the AM-10 withdrawal and AM-11 downgrade inline so a reader of the spec cannot reach the old claim. Phase C is deferred before starting, per the stop condition T02 wrote and the maintainer's decision. It is scoped to five rules; the measurement says eight acceptance rows have no instrument at all. Building it as written would proceed on a diagnosis the instrument had just contradicted. T04-T06 stay in the file with their analysis intact and move to CB-WP-0006. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
parent
4e8d89f482
commit
145611e3b6
3 changed files with 86 additions and 19 deletions
|
|
@ -211,7 +211,35 @@ flattering half. Update `specs/GameKernel.md` §5 and
|
|||
`specs/MetricsAndScenarios.md` §1 to match, and tag the new figures under
|
||||
`make facts-check` so they cannot drift.
|
||||
|
||||
## Phase C — implement what the instruments expose
|
||||
**Delivered.** `evidence/CB-EV-0001` §1 now carries a dated correction
|
||||
note and a new **Enforced** column carrying M-D1-MUT — because a row can
|
||||
be *measured* and still enforce nothing, and the scoreboard had no way to
|
||||
say so. §1a records what changed and how each was found.
|
||||
|
||||
**A fifth correction surfaced that ADR-0005 did not list:** AM-12 still
|
||||
read **$248.46**, the figure CB-WP-0002 disproved and corrected to
|
||||
$93.15. It had been stale in the evidence file ever since — **untagged,
|
||||
and therefore invisible to `facts-check`**. It is now tagged
|
||||
`fact:pinned_total`. A DFD instance that survived the gate built to catch
|
||||
DFD, because that gate only checks copies that opted in.
|
||||
|
||||
`specs/GameKernel.md` §5 carries the AM-10 withdrawal and the AM-11
|
||||
downgrade inline, so a reader of the spec cannot reach the old claim.
|
||||
|
||||
## Phase C — DEFERRED before starting (see T02)
|
||||
|
||||
> **Deferred 2026-07-31 by the stop condition in T02, maintainer decision.**
|
||||
> M-D1-MUT measured **4 of 14** (28.6%) against a 25% floor and a 71%
|
||||
> prediction. Phase C is scoped to K9/K10/K11/K14/K18 — five rules — but
|
||||
> the measurement says **8 of 14 acceptance rows have no instrument at
|
||||
> all**, which Phase C does not address. Building it as written would mean
|
||||
> proceeding on a diagnosis the instrument had just contradicted.
|
||||
>
|
||||
> T04, T05 and T06 stay in this file, unstarted, with their analysis
|
||||
> intact; they move to **CB-WP-0006**, which is scoped to the finding that
|
||||
> was actually measured rather than the one that was predicted.
|
||||
|
||||
## Phase C — implement what the instruments expose (deferred)
|
||||
|
||||
## Task: K9 and K11 — durable log, LogStore port, real conformance suite
|
||||
|
||||
|
|
|
|||
Loading…