Four verdicts in evidence/CB-EV-0001 corrected in place with a dated
note, per ADR-0005 §4: AM-7 replay split (timing met, hash-identical
withdrawn), AM-10 withdrawn as written and restated as AM-10' (the K6
determinism lint it actually measured), AM-11 downgraded to unmet, and
AM-1b added to the scoreboard it was missing from.
The scoreboard gains an Enforced column carrying M-D1-MUT, because a row
can be measured and still enforce nothing and the table had no way to say
so. AM-6 now reads "met, 16.5x" alongside "not enforced — nothing
compares any number to 100,000".
A fifth correction surfaced that ADR-0005 did not list: AM-12 still read
$248.46, the figure CB-WP-0002 disproved and corrected to $93.15 four
workplans ago. It was stale in the evidence file ever since — untagged,
and therefore invisible to facts-check. Now tagged. A duplicated-fact
instance that survived the gate built to catch duplicated facts, because
that gate only checks copies that opted in. Recorded for T07.
GameKernel §5 carries the AM-10 withdrawal and AM-11 downgrade inline so
a reader of the spec cannot reach the old claim.
Phase C is deferred before starting, per the stop condition T02 wrote and
the maintainer's decision. It is scoped to five rules; the measurement
says eight acceptance rows have no instrument at all. Building it as
written would proceed on a diagnosis the instrument had just
contradicted. T04-T06 stay in the file with their analysis intact and
move to CB-WP-0006.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>