92 lines
3 KiB
Markdown
92 lines
3 KiB
Markdown
|
|
---
|
||
|
|
id: capability.coordination.cross-owner-work
|
||
|
|
owner: coordination-engine
|
||
|
|
status: draft
|
||
|
|
domain: infotech
|
||
|
|
maturity:
|
||
|
|
discovery:
|
||
|
|
current: D3
|
||
|
|
target: D5
|
||
|
|
confidence: medium
|
||
|
|
rationale: Owner scope, neighboring responsibilities, concrete use cases and limitations
|
||
|
|
are documented; no exhaustive or generalized maturity claim.
|
||
|
|
availability:
|
||
|
|
current: A2
|
||
|
|
target: A2
|
||
|
|
confidence: medium
|
||
|
|
rationale: 'Source interface assessed 2026-10-14: Observation, lease, wake-up,
|
||
|
|
checkpoint and receipt contracts/runtime. Availability describes the delivery
|
||
|
|
form, not production acceptance. Coordinates owners without replacing their
|
||
|
|
execution or security authority.'
|
||
|
|
external_evidence:
|
||
|
|
completeness:
|
||
|
|
level: C1
|
||
|
|
confidence: low
|
||
|
|
basis: Source artifacts establish a bounded capability; no independent consumer-completeness
|
||
|
|
assessment in this review.
|
||
|
|
reliability:
|
||
|
|
level: R0
|
||
|
|
confidence: low
|
||
|
|
basis: No longitudinal consumer reliability measurement established by this review.
|
||
|
|
name: Cross-owner coordination lifecycle
|
||
|
|
summary: Observation, lease, wake-up, checkpoint and receipt contracts/runtime.
|
||
|
|
tags:
|
||
|
|
- security
|
||
|
|
- netkingdom
|
||
|
|
- framework-reuse
|
||
|
|
discovery:
|
||
|
|
intent: Observation, lease, wake-up, checkpoint and receipt contracts/runtime
|
||
|
|
includes:
|
||
|
|
- Observation, lease, wake-up, checkpoint and receipt contracts/runtime
|
||
|
|
excludes:
|
||
|
|
- Coordinates owners without replacing their execution or security authority
|
||
|
|
use_cases:
|
||
|
|
- 'U09: Maintainer observes posture, prioritizes findings, coordinates work and
|
||
|
|
verifies outcomes'
|
||
|
|
availability:
|
||
|
|
current_level: A2
|
||
|
|
target_level: A2
|
||
|
|
current_artifacts:
|
||
|
|
- SCOPE.md
|
||
|
|
- spec/cross-owner-wait-mode-v0.1.md
|
||
|
|
consumption_modes:
|
||
|
|
- CLI
|
||
|
|
- source
|
||
|
|
relations:
|
||
|
|
related_to:
|
||
|
|
- capability.security.iam-tooling-suite
|
||
|
|
evidence:
|
||
|
|
documentation:
|
||
|
|
- SCOPE.md
|
||
|
|
- spec/cross-owner-wait-mode-v0.1.md
|
||
|
|
consumer_guidance:
|
||
|
|
recommended_for:
|
||
|
|
- Maintainer observes posture, prioritizes findings, coordinates work and verifies
|
||
|
|
outcomes
|
||
|
|
not_recommended_for:
|
||
|
|
- Coordinates owners without replacing their execution or security authority
|
||
|
|
known_limitations:
|
||
|
|
- Coordinates owners without replacing their execution or security authority
|
||
|
|
- 2026-10-14 architecture review estimates operational maturity separately; a registry
|
||
|
|
entry does not authorize execution or establish deployment.
|
||
|
|
---
|
||
|
|
|
||
|
|
# Cross-owner coordination lifecycle
|
||
|
|
|
||
|
|
Observation, lease, wake-up, checkpoint and receipt contracts/runtime.
|
||
|
|
|
||
|
|
## Reuse boundary
|
||
|
|
|
||
|
|
Coordinates owners without replacing their execution or security authority.
|
||
|
|
|
||
|
|
## Supported use cases
|
||
|
|
|
||
|
|
- U09: Maintainer observes posture, prioritizes findings, coordinates work and verifies outcomes
|
||
|
|
|
||
|
|
## Evidence and integration
|
||
|
|
|
||
|
|
- [SCOPE.md](../../SCOPE.md)
|
||
|
|
- [spec/cross-owner-wait-mode-v0.1.md](../../spec/cross-owner-wait-mode-v0.1.md)
|
||
|
|
|
||
|
|
Assessment: CUST-WP-0081, 2026-10-14. Relations identify interfaces to compose; they do not certify native integration. Existing external evidence levels are retained where present. New entries use conservative C1/R0 until consumer assessment exists.
|