The probe cleanup is finished in the workplan and in the generated work-record index.
Assistant: grok
Assistant-Session: 01a16889-9224-7ec0-bee0-2a46dd3819c4
The 2026-10-21 Helm uninstall left a namespace check. The coulomb namespace is absent and probe.coulomb.social is NXDOMAIN, so T02 is done and the workplan is finished.
Assistant: grok
Assistant-Session: 01a16889-9224-7ec0-bee0-2a46dd3819c4
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 276069@bnt-lap001
Assistant-Session: 2e192b3d-b3e8-4403-94d4-d55a2c8b476c
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 276069@bnt-lap001
Assistant-Session: 2e192b3d-b3e8-4403-94d4-d55a2c8b476c
Updated by fix-consistency on 2026-10-21:
- workplan status: ready → active
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 276069@bnt-lap001
Assistant-Session: 2e192b3d-b3e8-4403-94d4-d55a2c8b476c
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 276069@bnt-lap001
Assistant-Session: 2e192b3d-b3e8-4403-94d4-d55a2c8b476c
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 8340@bnt-lap001
Assistant-Session: 2e192b3d-b3e8-4403-94d4-d55a2c8b476c
Receiving workplan for the 2026-10-21 node allocation review
(RESOURCE-WP-0008-T03 / CUST-WP-0071-T03). Wave-2 apply is human-gated;
no manifest changes.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 8340@bnt-lap001
Assistant-Session: 2e192b3d-b3e8-4403-94d4-d55a2c8b476c
Reviewed all open/active/blocked/proposed/ready workplans for finishable
loose ends. Only CORE-WP-0010-T05 remained open; its remaining checklist
(production stabilization gate against the live host, Forgejo admin
credential routing, rollback scale-down, operator approval) requires
production/operator access this session doesn't have. make test still
passes; move the workplan and task to blocked/wait rather than push
through unattended.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: sonnet
Assistant-Process: 234666@bnt-lap001
Assistant-Session: 1045ad4c-e006-4e1c-afb0-c3dfc2961215
Set flavor on open workplans from origin/prose/status. Copy existing
depends_on aliases only. Do not promote residuals.
Assistant: grok
Assistant-Session: 01a09dc1-b21e-77e1-919e-fcad2f82b267
REPO-WP-0001/0002 belong to repo-seed: these copies carry `repo: repo-seed`
in their own frontmatter, so they are template residue from seeding rather
than work this repository did under its own identity. They collided with
repo-seed's real records on every projection reset.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 2583210@bnt-lap001
Assistant-Session: f2bff2d5-e9b2-4338-92ca-10282a927006
These workplans exist only in the retired local hub. Their random pre-ADR-007
identifiers are refused by C-06 as stale references, so they cannot be
registered. Deriving from the canonical record id takes no identity from
anything: central does not hold them and the old ids die with the cache.
Records central already holds were deliberately left untouched.
Refs CUST-WP-0068-T06
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 2583210@bnt-lap001
Assistant-Session: f2bff2d5-e9b2-4338-92ca-10282a927006
Import slugify_or_default from hub-core, add contract tests, vendor hub-core in
Docker/Forgejo CI, document metadata isolation and pagination deferral, and
align INTENT/SCOPE with three-repo stack.
Operator sign-off recorded. Inter-Hub renamed to inter-hub-haskell on
Forgejo, rollback deployments scaled to 0, haskell build lane parked, and
cross-repo references updated. Workplan archived.
Document that migration and cutover prerequisites are closed, T01 is
unblocked, and T02–T04 wait on operator stabilization sign-off and the
Inter-Hub rollback retirement sequence.
Mark the migration and cutover workplan finished (all tasks done on
2026-07-03) and move it to workplans/archived/260703-CORE-WP-0005-data-migration-and-cutover.md.