--- id: CORE-WP-0007 type: workplan title: "Retire Haskell/IHP infrastructure after Core Hub cutover" domain: infotech repo: core-hub status: active owner: codex topic_slug: custodian created: "2026-06-27" updated: "2026-07-07" state_hub_workstream_id: "a8d66822-e435-4b1e-ad81-37a298d1795e" --- # Retire Haskell/IHP infrastructure after Core Hub cutover Remove the Haskell dependency from the production interaction framework after the replacement is proven. `CORE-WP-0005` finished 2026-07-03: `hub.coulomb.social` ingress now serves Core Hub; Inter-Hub compatibility, staging import, dual-run smokes, and production cutover gates are closed. Haskell retirement no longer waits on migration work — it waits on a short post-cutover stabilization window, operator approval to retire the Inter-Hub rollback deployment, and the four tasks below. ## Retire Probe Repo ```task id: CORE-WP-0007-T01 status: done priority: medium state_hub_task_id: "d3a494a3-dc23-491f-af32-1d19120b3aae" ``` Rename or archive `ihp-railiance-probe` (`coulomb/ihp-railiance-probe`), preserving `INTENT.md` and `DeploymentBlueprint.md` notes about the failed IHP/GHC/Nix build path. `IRP-WP-0001` is already `done`; this task is unblocked and can proceed independently of T02–T04. ## Rename Production Inter-Hub Repo ```task id: CORE-WP-0007-T02 status: wait priority: high state_hub_task_id: "16eb7ce3-b574-4667-a189-c14ff5d0502b" ``` Rename `inter-hub` to `inter-hub-haskell` after operator stabilization sign-off and approval to retire the Inter-Hub rollback path. Compatibility, migration, and production cutover gates from `CORE-WP-0005` are satisfied; the Inter-Hub k8s deployment in namespace `inter-hub` still runs as rollback-only (ingress already moved — see `k8s/railiance-production/README.md`). Scope when unblocked: Forgejo repo rename, registry/Helm/CI path updates in `railiance-apps` and `railiance-forge`, and eventual scale-down of the rollback deployment after the stabilization window closes. ## Decommission Haskell Build Lane ```task id: CORE-WP-0007-T03 status: wait priority: medium state_hub_task_id: "bea9943c-916f-402f-a6d9-7907bb48137c" ``` Retire or park haskelseed runner labels, the `haskell-build` VM profile, IHP/GHC/Nix/devenv docs, and build-machine workplans after T02 completes and no active repo still needs Haskell image builds. Primary touchpoints: `railiance-forge` runner substrate docs, `sand-boxer` `profile.vm-haskell-build`, and `ops-bridge` haskelseed tunnel notes. ## Update Cross-Repo References ```task id: CORE-WP-0007-T04 status: wait priority: medium state_hub_task_id: "ed7f8e01-5305-465c-8bfc-04bc47bfdf40" ``` After T02, update docs and workplans in consuming repos so production Inter-Hub references point to Core Hub and historical Haskell context explicitly names `inter-hub-haskell`. Known stale surfaces: `ops-hub` INTENT/SCOPE/README and readiness docs; `activity-core` railiance probes and sink vocabulary; `the-custodian` service catalog and drain plans. Core Hub specs and migration fixtures already use `inter-hub-haskell` as the bundle `source` name. ## Progress 2026-07-07 — upstream gate cleared `CORE-WP-0005` archived (`260703-CORE-WP-0005-data-migration-and-cutover.md`). Production cutover executed 2026-07-03: Core Hub serves `hub.coulomb.social`; post-flip reconcile import was idempotent (0 created / 28 updated / 0 errors); rollback remains one kubectl command while the Inter-Hub deployment stays running through stabilization. Revised sequencing: 1. **T01** — unblocked; archive `ihp-railiance-probe` first (low risk). 2. **T02** — cutover prerequisites met; blocked on operator stabilization sign-off and approval to retire the Inter-Hub rollback deployment. 3. **T03** — blocked on T02 and confirmation that no repo still schedules Haskell builds through haskelseed. 4. **T04** — blocked on T02 so references use the final repo name. Related finished workplans: `CORE-WP-0004` (compatibility smokes), `CORE-WP-0005` (migration/cutover), `CORE-WP-0008` (deployed ops evidence). ## Completion 2026-07-07 — T01 probe repo archived `ihp-railiance-probe` retired in-repo: - `README.md` marks the repo archived and points to preserved docs - `INTENT.md` and `SCOPE.md` updated with retirement context - `IRP-WP-0001` moved to `workplans/archived/260707-IRP-WP-0001-pipeline-validation.md` (`status: archived`) - Gitea/Forgejo CI workflows switched to `workflow_dispatch` only (no push triggers) Forgejo repo archive/rename on the forge remains optional; git history and diagnostic docs are preserved locally and on `gitea.coulomb.social`.