Reviewed all open/active/blocked/proposed/ready workplans for finishable loose ends. Only CORE-WP-0010-T05 remained open; its remaining checklist (production stabilization gate against the live host, Forgejo admin credential routing, rollback scale-down, operator approval) requires production/operator access this session doesn't have. make test still passes; move the workplan and task to blocked/wait rather than push through unattended. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Assistant: claude-code Assistant-Model: sonnet Assistant-Process: 234666@bnt-lap001 Assistant-Session: 1045ad4c-e006-4e1c-afb0-c3dfc2961215 |
||
|---|---|---|
| .. | ||
| archived | ||
| CORE-WP-0001-statehub-bootstrap.md | ||
| CORE-WP-0002-contract-ir-freeze.md | ||
| CORE-WP-0003-fastapi-postgres-foundation.md | ||
| CORE-WP-0004-interhub-compatibility-and-consumer-smoke.md | ||
| CORE-WP-0006-operator-console-and-whynot-ui.md | ||
| CORE-WP-0008-api-first-ops-evidence-continuation.md | ||
| CORE-WP-0009-hub-core-adoption-and-integration.md | ||
| CORE-WP-0010-runtime-absorption-and-archive.md | ||
| CORE-WP-0011-railiance01-production-relocation.md | ||