Install backup capacity guard and bind scoped continuation
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s

Assistant: codex
Assistant-Model: gpt-6.1-sol
Assistant-Session: 01a11fd9-caf6-7a63-b578-9daaaa134ff2
This commit is contained in:
tegwick 2026-10-09 19:54:31 +02:00
parent 4ecbb0fb62
commit 42e8b2040b
4 changed files with 54 additions and 0 deletions

View file

@ -0,0 +1,22 @@
{
"schema": "email-connect.ledger-runtime-update.v1",
"date": "2026-10-09",
"status": "installed_verified",
"files": {
"backup-ledger.py": "e74c41948ca01dae09578e2abfba14b96fb1f158af0ec91a0fb1aa9ecaf01680",
"rehearse-ledger.py": "d3da88972e44dac3800afb48d21e525dc1476ca58de3e7702f7751aea33eda53"
},
"receiver_image": "forgejo.coulomb.social/coulomb/email-connect@sha256:eb3e7b68d21209e9eb71b928a5b0bc987e8e3164f21dca4ff712f946d0c103f2",
"receiver_pin_changed": false,
"timers_enabled": false,
"capacity": {
"status": "headroom_verified",
"local_bytes": 148994,
"minimum_free_bytes": 8589934592,
"local_budget_bytes": 8589934592
},
"private_credentials_read": false,
"backup_executed": false,
"caller_custody_decision_id": "8edbff8c-f62d-4357-8465-8eb37300f311",
"caller_custody_receipt_present": false
}

View file

@ -236,3 +236,14 @@ chat, argv, evidence, Git or the operations inbox.
Full email regression: 193 passed, zero skips; focused syntax checks pass.
Timers remain disabled. T03/T04 stay progress until durable independent custody,
retention/schedule admission and actual recurring operation are evidenced.
## Runtime guard installed — 2026-10-09
User instructed continuation. Installed the reviewed capacity guard and offline
image-binding rehearsal helper on railiance01 after comparing existing hashes
with the first-run runtime manifest. Readback hashes match the closure contract.
Actual pre-capture capacity check passes: retained local files 148,994 bytes,
8 GiB minimum free space and 8 GiB local budget. No credential read or backup run.
Receiver image/pins remain eb3e7b68 and both timers remain disabled. Receipt:
deploy/backup/runtime-update-2026-10-09.json. Earlier preparation evidence retains
its historical statement that node helpers had not yet changed.

View file

@ -225,3 +225,14 @@ chat, argv, evidence, Git or the operations inbox.
Full email regression: 193 passed, zero skips; focused syntax checks pass.
Timers remain disabled. T03/T04 stay progress until durable independent custody,
retention/schedule admission and actual recurring operation are evidenced.
## Runtime guard installed — 2026-10-09
User instructed continuation. Installed the reviewed capacity guard and offline
image-binding rehearsal helper on railiance01 after comparing existing hashes
with the first-run runtime manifest. Readback hashes match the closure contract.
Actual pre-capture capacity check passes: retained local files 148,994 bytes,
8 GiB minimum free space and 8 GiB local budget. No credential read or backup run.
Receiver image/pins remain eb3e7b68 and both timers remain disabled. Receipt:
deploy/backup/runtime-update-2026-10-09.json. Earlier preparation evidence retains
its historical statement that node helpers had not yet changed.

View file

@ -170,3 +170,13 @@ evidence: deploy/closure/evidence-2026-10-09.json. Reviewed plan SHA256: 8e529e2
Attended caller custody, native reader proofs and coordinated scoped activation
remain open. T03 stays progress; live receiver and caller mode are unchanged.
Execution handoff: docs/caller-policy-draft-2026-10-08.md.
## Scoped continuation authorized — 2026-10-09
User instructed continuation after the activation handoff. Decision
8edbff8c-f62d-4357-8465-8eb37300f311 binds the existing reviewed plan SHA256
8e529e2ffdb6ee3d53a768d65b2d025b95e788734c48a29f2f8b975825dbaed7.
OpenBao edge is initialized/unsealed. The private receipt directory exists and
the exact silent attended command was supplied to the user. No completed login,
credential issue or native reader proof is claimed; awaiting the actual receipt.
Current receiver/user-engine deployments remain Ready at their baseline images.