C-34 flagged status=ready without a DoR assessment. The warning was right: the
plan claimed repo-state review with no review metadata, and work-item-dor.md
prefers DoR-Failed for a ready claim in that state.
Adds reviewed_at, reviewed_against_commit (5753b47 — the code state the
alignment review actually checked each obligation against), the origin pointer
to the review, and quality_dor: DoR-Ok with the criteria walked in the note.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_012sgN4GH5ZYT8pJVkCR6dcP
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 4014348@bnt-lap001
Assistant-Session: a993abda-65a0-4ea8-8ccd-0fcd78c92ac0