Commit graph

10 commits

Author SHA1 Message Date
a78187c33e Make the sensing loop durable and pin the reserve to Scaleway
The weekday brief only counts when the file is on origin/main. Hub
events without git objects are failures. The open-weight SoT moves
from the VAULT 850 GiB quota to a dedicated Scaleway bucket (One Zone
IA for R, Glacier for S) so V4-Flash and K3 are economically in-scope.

Catalogs the real DeepSeek-V4-Flash-0731 (MIT ~167 GiB MoE, not 12B)
and nominates Qwen3.8-27B. Bucket create remains FI-WP-0004-T08.

Assistant: grok
Assistant-Session: 01a09c6a-1cfc-75b1-a78d-c13eaf22241d
2026-09-13 22:45:43 +02:00
846cccd476 docs: morning review via activity CLI 2026-08-06 13:05:49 +02:00
50c6b64a83 docs: claim loop primary; dual-clock FI timer disabled
Align recurrence-ops with activity-core cutover after per-fire ops_run
idempotency fix (2026-08-05).
2026-08-05 15:34:09 +02:00
6d0ab181b6 Add claim-loop install steps to FI recurrence-ops. 2026-08-03 20:05:26 +02:00
7d0cd7644a Document claim-loop as primary FI executor path (REIN-A-0002).
Host timer remains break-glass until timer cutover proof window.
2026-08-03 20:04:26 +02:00
46cfcd7a51 Align FI recurrence with activity-core + rein-aharness (drop workstation cron).
Document the three-layer model, add railiance-rhythm executor install, and
point playbooks at rein-aharness fi-research-brief instead of local crontab.
2026-08-03 17:53:07 +02:00
70cbfe0c6c Catch up field brief, catalog Kimi K3, and wire live daily recurrence.
Add 2026-08-03 week catch-up brief with Kimi K3 as S1 strategic (collection
deferred on ~1454 GiB vs 850 GiB soft quota), document recurrence ops, and add a
workstation due-notice consumer cron helper. Production schedule was applied to
railiance ConfigMap and Temporal (weekdays 07:30 Europe/Berlin).
2026-08-03 17:37:53 +02:00
a83ef0a79a Register reserve under agents hub and pin VAULT storage.
Classify freedom-intelligence for State Hub (agents domain), sync FI-WP-0001..0003 with hub IDs, enrich catalog entries with profile/SWOT, and pin the open-weight reserve to D:\vault\coulomb\freedom-intelligence\ with strategic S-tier policy.
2026-07-28 00:25:21 +02:00
cd29105756 Add first daily research brief and advance activity-core workplan.
Record 2026-07-24 delta brief from the baseline survey, document fi_brief_status
ops loading, and mark FI-WP-0002 T03/T06 complete after resolver and playbook work.
2026-07-24 00:17:44 +02:00
b5f911140b Establish Freedom Intelligence lab foundation and baseline research.
Add INTENT/SCOPE, daily-brief playbook, activity-core definition (disabled),
workplans FI-WP-0001..0003, baseline field survey with open-weight collection
recommendations, and inventory catalog candidates for the model reserve.
2026-07-24 00:15:27 +02:00