Commit graph

4 commits

Author SHA1 Message Date
46cfcd7a51 Align FI recurrence with activity-core + rein-aharness (drop workstation cron).
Document the three-layer model, add railiance-rhythm executor install, and
point playbooks at rein-aharness fi-research-brief instead of local crontab.
2026-08-03 17:53:07 +02:00
70cbfe0c6c Catch up field brief, catalog Kimi K3, and wire live daily recurrence.
Add 2026-08-03 week catch-up brief with Kimi K3 as S1 strategic (collection
deferred on ~1454 GiB vs 850 GiB soft quota), document recurrence ops, and add a
workstation due-notice consumer cron helper. Production schedule was applied to
railiance ConfigMap and Temporal (weekdays 07:30 Europe/Berlin).
2026-08-03 17:37:53 +02:00
77d4ffe86e Finish FI-WP-0002 and FI-WP-0003: daily rhythm and R-spine reserve.
Enable fi-daily-research-brief, prove fi_brief_status idempotence with the
2026-07-28 brief, approve R/S catalog entries, collect and verify embeds plus
Qwen3-8B and R1-Distill-14B on VAULT, and document residuals (HF-gated Llama,
deferred S giants, railiance ConfigMap apply).
2026-07-28 01:30:55 +02:00
b5f911140b Establish Freedom Intelligence lab foundation and baseline research.
Add INTENT/SCOPE, daily-brief playbook, activity-core definition (disabled),
workplans FI-WP-0001..0003, baseline field survey with open-weight collection
recommendations, and inventory catalog candidates for the model reserve.
2026-07-24 00:15:27 +02:00