The weekday brief only counts when the file is on origin/main. Hub
events without git objects are failures. The open-weight SoT moves
from the VAULT 850 GiB quota to a dedicated Scaleway bucket (One Zone
IA for R, Glacier for S) so V4-Flash and K3 are economically in-scope.
Catalogs the real DeepSeek-V4-Flash-0731 (MIT ~167 GiB MoE, not 12B)
and nominates Qwen3.8-27B. Bucket create remains FI-WP-0004-T08.
Assistant: grok
Assistant-Session: 01a09c6a-1cfc-75b1-a78d-c13eaf22241d
Document the three-layer model, add railiance-rhythm executor install, and
point playbooks at rein-aharness fi-research-brief instead of local crontab.
Add 2026-08-03 week catch-up brief with Kimi K3 as S1 strategic (collection
deferred on ~1454 GiB vs 850 GiB soft quota), document recurrence ops, and add a
workstation due-notice consumer cron helper. Production schedule was applied to
railiance ConfigMap and Temporal (weekdays 07:30 Europe/Berlin).
Record 2026-07-24 delta brief from the baseline survey, document fi_brief_status
ops loading, and mark FI-WP-0002 T03/T06 complete after resolver and playbook work.
Add INTENT/SCOPE, daily-brief playbook, activity-core definition (disabled),
workplans FI-WP-0001..0003, baseline field survey with open-weight collection
recommendations, and inventory catalog candidates for the model reserve.