Separate authority projection and delivery in measured seed review

Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a0cffe-206f-7323-89d3-b20ca4cf4bf9
This commit is contained in:
tegwick 2026-09-27 01:57:30 +02:00
parent 2df1d9482b
commit 3ce54fb2d2
14 changed files with 311 additions and 8 deletions

View file

@ -268,3 +268,20 @@ execution remain pending; zero new drafts is a valid outcome. The earlier Zulip
caller/transport/test question remains open with its recorded limitations; no fixture
restart. WP-0002 T03 independent validation, T02/T03 gates here, and WP-0006 comparable
measurement remain unchanged. Do not treat classification counts as maturity.
## Authority/projection cycle completed — 2026-09-27
LEARN-0015 preregistered at 2df1d94; six primary documents across four families,
six seed dispositions and two synthetic VC-01/02 decision traces. One classification
revision: separate scoped acceptance, projection placement and delivery schedule.
Zero new drafts; all seventeen hypotheses and candidate profiles unchanged. No
application execution, full-contract recurrence, human validation or M1/M2 closure.
See [review](../research/reviews/AuthorityProjectionComparison.md). Fifth distinct
prospective group; no comparable-window trend.
WP-0003 T01 next: preregister one bounded pinned-application study of shared-state
acceptance versus local editing and a projection transition, using the review's six
questions. Select the application by the needed evidence; retain contrary/unknown
paths. Existing Zulip auxiliary continuation residual stays open; local navigation
fixture remains paused. WP-0002 T03 retains independent usefulness review; WP-0003
T02/T03 gates and WP-0006 T03 review dates/comparable measurement remain open.

View file

@ -140,3 +140,20 @@ independent recurrence, contrasting coverage/coherence, reference access and
comparable learning evidence. Recommendations map to existing WP-0002/0003/0004/0006
tasks; statuses and M1/M2 gates are unchanged. This documentation assessment is not
a measured empirical cycle. T03 retains review-date and comparable-window work.
## Authority/projection cycle completed — 2026-09-27
LEARN-0015 preregistered at 2df1d94; six primary documents across four families,
six seed dispositions and two synthetic VC-01/02 decision traces. One classification
revision: separate scoped acceptance, projection placement and delivery schedule.
Zero new drafts; all seventeen hypotheses and candidate profiles unchanged. No
application execution, full-contract recurrence, human validation or M1/M2 closure.
See [review](../research/reviews/AuthorityProjectionComparison.md). Fifth distinct
prospective group; no comparable-window trend.
WP-0003 T01 next: preregister one bounded pinned-application study of shared-state
acceptance versus local editing and a projection transition, using the review's six
questions. Select the application by the needed evidence; retain contrary/unknown
paths. Existing Zulip auxiliary continuation residual stays open; local navigation
fixture remains paused. WP-0002 T03 retains independent usefulness review; WP-0003
T02/T03 gates and WP-0006 T03 review dates/comparable measurement remain open.