Close local review loose ends and record blocked workplan gates

Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a0e241-8285-7a63-8c0c-51c9cb824dc3
This commit is contained in:
tegwick 2026-09-27 17:20:43 +02:00
parent bcdb02323c
commit 7295172f1e
20 changed files with 510 additions and 95 deletions

View file

@ -0,0 +1,42 @@
# Workplan closeout audit — 2026-09-27
User requested implementation of finishable local loose ends, no unnecessary new
work records, blocked states for blocked plans, then commit and sync. All eight
repository workplans were assessed; no new task or workplan was created. Historical
progress sections remain historical; the final closeout section gives current state.
| Workplan | Result | Completed here / remaining acceptance |
| --- | --- | --- |
| FEP-WP-0001 | finished, unchanged | All bootstrap tasks already done |
| FEP-WP-0002 | blocked | T03 waits for independent usefulness and validated seed-case evidence; existing M1 review is revise/defer |
| FEP-WP-0003 | blocked | T03 complete: full M2 editorial/ontology review, all seventeen candidates and ten cases. T02 waits on M1; T01 source/reproduction work and T04 real storage/receiver investigation remain unfinished |
| FEP-WP-0004 | blocked | T01 waits on M1; T02/T03 wait on M2. Preview output cannot replace canonical/held-out/empirical acceptance |
| FEP-WP-0005 | finished, unchanged | Bench setup already delivered; adapter regression checks passed |
| FEP-WP-0006 | active | T03 review-date reconciliation complete; comparable-window assessment still needs useful prospective cycles under a shared protocol |
| FEP-WP-0007 | finished, unchanged | Published 0.1 preview preserved byte-for-byte |
| FEP-WP-0008 | blocked | T01 frozen-release isolation complete; hosted consumer integration, producer hook, real linked outcomes and admitted executor remain required |
Local implementation adds a version/current registry and validates old publications
from their pinned Git objects, separately from live research validation. Regression
checks cover legitimate new research, stale live profiles and tampered publication
inputs. Fourteen unknown substantive-review dates now have original-artifact
provenance; the three existing dates are corroborated. Validation requires scoped
provenance and rejects dates later than their metadata assessment. Historical
baseline and published version are unchanged.
The [M2 review](../research/reviews/M2-CoverageReview.md) closes delivery of the
editorial assessment with an explicit revise/defer result; it does not close M2.
The [date reconciliation](../research/reviews/ReviewDateReconciliation.md) adds no
learning cycle or fabricated effort. Six incomparable prospective groups cannot
satisfy the three-comparable-cycle trigger.
Activity-core reporting and collection are operational with three enabled schedules;
no consumer is enrolled and no pattern-edit executor is admitted. Existing external
owners remain ACTIVITY-WP-0041 T03, GLAS-WP-0012 and HFACT-WP-0001. The October 1
monthly reporting obligation remains, including empty/blocked evidence if unchanged.
No schedule, external deployment or sibling repository was changed by this audit.
Verification: schema tests, bench adapter tests and synthetic bench plan; reference
and evolution tests; reference/evolution/classification consistency checks; changed
Markdown links and whitespace. The plan command makes no provider calls. These
checks validate repository contracts, not independent usefulness or live execution.