Close local review loose ends and record blocked workplan gates
Assistant: codex Assistant-Model: gpt-6-astra Assistant-Session: 01a0e241-8285-7a63-8c0c-51c9cb824dc3
This commit is contained in:
parent
bcdb02323c
commit
7295172f1e
20 changed files with 510 additions and 95 deletions
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Validate the seed frontend pattern language"
|
||||
domain: infotech
|
||||
repo: frontend-patterns
|
||||
status: active
|
||||
status: blocked
|
||||
quality_dor: DoR-Ok
|
||||
quality_dor_at: "2026-09-24"
|
||||
quality_dor_by: codex
|
||||
|
|
@ -61,7 +61,7 @@ counterexamples. Reconcile README maturity claims with the evidence.
|
|||
|
||||
```task
|
||||
id: FEP-WP-0002-T03
|
||||
status: progress
|
||||
status: wait
|
||||
priority: medium
|
||||
state_hub_task_id: "54940b04-1d0f-5bff-98d4-be290eca8048"
|
||||
```
|
||||
|
|
@ -347,3 +347,12 @@ obligation is declared satisfied merely by transfer. Workplan remains active.
|
|||
The eight-record editorial core is suitable for a qualified research preview; M1
|
||||
remains revise/defer and T03 progress. WP-0007 packages it without canonical admission,
|
||||
independent-human claims or fresh held-out evaluation.
|
||||
|
||||
## Closeout audit — 2026-09-27
|
||||
|
||||
Workplan blocked; T03 waits on the independent usefulness/validated-case evidence
|
||||
identified in [M1-SeedReview](../research/reviews/M1-SeedReview.md). The connected
|
||||
core, two synthetic walkthroughs and review are delivered, but the gate is revise/defer.
|
||||
Reopen when independent evidence and the outstanding quality/recovery assumptions
|
||||
can be assessed; a metadata edit or another author-model review cannot supply it.
|
||||
Storage/receiver mechanism work already belongs to WP-0003 T04. No new task.
|
||||
|
|
|
|||
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Challenge the language across architectural schools"
|
||||
domain: infotech
|
||||
repo: frontend-patterns
|
||||
status: active
|
||||
status: blocked
|
||||
owner: codex
|
||||
topic_slug: canon
|
||||
created: "2026-09-24"
|
||||
|
|
@ -34,7 +34,7 @@ Build a source coverage matrix for streams A–F in ResearchProgram.md. Complete
|
|||
|
||||
```task
|
||||
id: FEP-WP-0003-T02
|
||||
status: todo
|
||||
status: wait
|
||||
priority: high
|
||||
state_hub_task_id: "05de53b6-1771-5137-9602-bf614cb1bf0a"
|
||||
```
|
||||
|
|
@ -45,7 +45,7 @@ After the M1 review, complete VC-03 through VC-06 using the walkthrough template
|
|||
|
||||
```task
|
||||
id: FEP-WP-0003-T03
|
||||
status: todo
|
||||
status: done
|
||||
priority: medium
|
||||
state_hub_task_id: "2b7252c1-c453-5050-96fb-d86a3f3df0f0"
|
||||
```
|
||||
|
|
@ -330,3 +330,17 @@ infrastructure if feasible within a new budget. Existing auxiliary-navigation re
|
|||
stays open, local navigation fixture stays paused, and WP-0003 T04 retains storage/
|
||||
receiver validation. WP-0006 T03 retains review dates/comparable-window work; this sixth
|
||||
prospective group supplies no learning trend. Human validation and M1/M2/M3 stay open.
|
||||
|
||||
## Closeout audit — 2026-09-27
|
||||
|
||||
T03 done: [M2-CoverageReview](../research/reviews/M2-CoverageReview.md) records all
|
||||
seventeen dispositions, conditional relations, quality limits, six-stream evidence
|
||||
and ten-case coverage. Result: revise/defer, not M2 acceptance. All unresolved work
|
||||
stays in existing T01/T02/T04, WP-0002 T03 and WP-0004; no new task or workplan.
|
||||
|
||||
Workplan blocked because T02's M1 prerequisite remains unmet. T02 is wait until
|
||||
WP-0002's evidence gate is satisfied; then complete VC-03–06 and review VC-07–10.
|
||||
T01 remains progress for useful bounded source/reproduction questions; T04 remains
|
||||
todo for a preregistered concrete storage/real-receiver investigation. These are
|
||||
unfinished research, not falsely declared external blockers or completed by this
|
||||
editorial review. Bounded exploratory work retains its existing authorization.
|
||||
|
|
|
|||
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Evaluate retrieval and real repository applicability"
|
||||
domain: infotech
|
||||
repo: frontend-patterns
|
||||
status: proposed
|
||||
status: blocked
|
||||
owner: codex
|
||||
topic_slug: canon
|
||||
created: "2026-09-24"
|
||||
|
|
@ -22,7 +22,7 @@ Individual task descriptions identify any work that can start earlier.
|
|||
|
||||
```task
|
||||
id: FEP-WP-0004-T01
|
||||
status: todo
|
||||
status: wait
|
||||
priority: high
|
||||
state_hub_task_id: "4fec98f6-fee2-52fc-a01c-f490c79ee0f8"
|
||||
```
|
||||
|
|
@ -33,7 +33,7 @@ After the schema and seed examples pass M1, implement the smallest validator/exp
|
|||
|
||||
```task
|
||||
id: FEP-WP-0004-T02
|
||||
status: todo
|
||||
status: wait
|
||||
priority: medium
|
||||
state_hub_task_id: "4bdd4c53-fcdb-5dfd-9a37-ebc3fee4d445"
|
||||
```
|
||||
|
|
@ -44,7 +44,7 @@ After M2, freeze a corpus revision and evaluate at least six unseen prompts foll
|
|||
|
||||
```task
|
||||
id: FEP-WP-0004-T03
|
||||
status: todo
|
||||
status: wait
|
||||
priority: medium
|
||||
state_hub_task_id: "ab66848b-1045-54dd-9711-52c5560faafa"
|
||||
```
|
||||
|
|
@ -59,3 +59,11 @@ before M1/M2. It is distinct from this workplan's canonical export and held-out
|
|||
claims; it does not rename consumed feedback into unseen evaluation cases. This plan
|
||||
remains proposed with its original task gates. Routine reuse must not await those
|
||||
claims or require a human survey; preserve evidence provenance and honest unknowns.
|
||||
|
||||
## Closeout audit — 2026-09-27
|
||||
|
||||
Workplan blocked. T01 waits for the schema/seed M1 acceptance; T02 and T03 wait for
|
||||
M2 under the phase prerequisite. The M1 and M2 reviews both say revise/defer. Reopen
|
||||
each task only on the recorded prerequisite evidence. Existing preview validation
|
||||
and development cases are useful outputs of WP-0007/WP-0008, not canonical export,
|
||||
held-out evaluation or two complete real-repository applicability studies.
|
||||
|
|
|
|||
|
|
@ -176,3 +176,16 @@ infrastructure if feasible within a new budget. Existing auxiliary-navigation re
|
|||
stays open, local navigation fixture stays paused, and WP-0003 T04 retains storage/
|
||||
receiver validation. WP-0006 T03 retains review dates/comparable-window work; this sixth
|
||||
prospective group supplies no learning trend. Human validation and M1/M2/M3 stay open.
|
||||
|
||||
## Closeout audit — 2026-09-27
|
||||
|
||||
T03 review-date reconciliation is complete: [dated provenance report](../research/reviews/ReviewDateReconciliation.md)
|
||||
resolves fourteen unknown dates and corroborates the three known dates from original
|
||||
artifacts. Current-profile validation requires review provenance/scope and prevents
|
||||
a date later than its assessment. Historical baseline and 0.1 release are unchanged.
|
||||
|
||||
T03 remains progress, workplan active: LEARN-0011–0016 belong to six different
|
||||
comparison groups, none with three comparable cycles. The returns review needs useful
|
||||
further prospective research under the existing task; do not manufacture repetitions
|
||||
or pool incompatible protocols to close it. There is no external blocker on that
|
||||
research and no claim that a metadata reconciliation is a new learning cycle.
|
||||
|
|
|
|||
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Close the ecosystem reuse and improvement loop"
|
||||
domain: infotech
|
||||
repo: frontend-patterns
|
||||
status: active
|
||||
status: blocked
|
||||
lane: blue
|
||||
owner: codex
|
||||
topic_slug: canon
|
||||
|
|
@ -30,7 +30,7 @@ the user's instruction. This is not a request for another up-front approval roun
|
|||
|
||||
```task
|
||||
id: FEP-WP-0008-T01
|
||||
status: progress
|
||||
status: wait
|
||||
priority: high
|
||||
lane: blue
|
||||
state_hub_task_id: "453fc06b-be70-5913-a816-161cabe9a0a1"
|
||||
|
|
@ -61,7 +61,7 @@ in this design session; hosted registration and consumer integration remain open
|
|||
|
||||
```task
|
||||
id: FEP-WP-0008-T02
|
||||
status: progress
|
||||
status: wait
|
||||
priority: high
|
||||
lane: blue
|
||||
state_hub_task_id: "49be8a8e-eaaf-5f1c-b4cd-f0c4dbac9823"
|
||||
|
|
@ -88,7 +88,7 @@ refresh after 14 days and remain unknown after 30; no manual survey dependency.
|
|||
|
||||
```task
|
||||
id: FEP-WP-0008-T03
|
||||
status: progress
|
||||
status: wait
|
||||
priority: high
|
||||
lane: blue
|
||||
state_hub_task_id: "f823587c-727d-515a-974d-401719420ce5"
|
||||
|
|
@ -179,3 +179,26 @@ sync remains off; authenticated receipt/identity and failed-health rollback proo
|
|||
remain in ACTIVITY-WP-0041-T03. Digest-aware registry retention is tracked by
|
||||
RPF-WP-0048-T03; current baseline tags are protected. Reporting is operational;
|
||||
consumer enrollment and admitted pattern-editing execution remain unfinished.
|
||||
|
||||
## Closeout audit — 2026-09-27
|
||||
|
||||
Local frozen-publication prerequisite in T01 is complete: [release registry](../reference/releases.json),
|
||||
explicit version selection and Git-pinned corpus/package reads isolate old exports
|
||||
from legitimate current-research edits. Regression tests exercise current research
|
||||
changing independently, stale live profiles and altered published artifacts.
|
||||
|
||||
Workplan blocked; T01/T02/T03 wait on their end-to-end dependencies. T01 needs hosted
|
||||
discovery and common-template-owner integration into an actual eligible frontend task,
|
||||
including its first pinned decision note. T02 needs the producer closeout hook and
|
||||
real use plus linked outcome; activity-core owns the existing executable event validator
|
||||
and deterministic collector. The roster is still empty. Do not invent a demo consumer
|
||||
or copy its fixtures into the real stream. Reopen these tasks when an eligible actual
|
||||
consumer and the template integration are available.
|
||||
|
||||
T03 needs an admitted, budget-enforced pattern-edit executor (GLAS-WP-0012 /
|
||||
HFACT-WP-0001), authenticated standing release/rollback proof (ACTIVITY-WP-0041 T03),
|
||||
and a real unassisted cycle with monthly packet. Reporting and collection are already
|
||||
operational; their three schedules remain enabled. The first monthly packet remains
|
||||
due October 1; missing consumer/executor evidence must be reported as such. This audit
|
||||
does not disable schedules or conflate the reporting worker with mutation authority.
|
||||
Existing owner work records retain all dependencies; no replacement workplan is opened.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue