Close local review loose ends and record blocked workplan gates

Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a0e241-8285-7a63-8c0c-51c9cb824dc3
This commit is contained in:
tegwick 2026-09-27 17:20:43 +02:00
parent bcdb02323c
commit 7295172f1e
20 changed files with 510 additions and 95 deletions

View file

@ -4,7 +4,7 @@ type: workplan
title: "Close the ecosystem reuse and improvement loop"
domain: infotech
repo: frontend-patterns
status: active
status: blocked
lane: blue
owner: codex
topic_slug: canon
@ -30,7 +30,7 @@ the user's instruction. This is not a request for another up-front approval roun
```task
id: FEP-WP-0008-T01
status: progress
status: wait
priority: high
lane: blue
state_hub_task_id: "453fc06b-be70-5913-a816-161cabe9a0a1"
@ -61,7 +61,7 @@ in this design session; hosted registration and consumer integration remain open
```task
id: FEP-WP-0008-T02
status: progress
status: wait
priority: high
lane: blue
state_hub_task_id: "49be8a8e-eaaf-5f1c-b4cd-f0c4dbac9823"
@ -88,7 +88,7 @@ refresh after 14 days and remain unknown after 30; no manual survey dependency.
```task
id: FEP-WP-0008-T03
status: progress
status: wait
priority: high
lane: blue
state_hub_task_id: "f823587c-727d-515a-974d-401719420ce5"
@ -179,3 +179,26 @@ sync remains off; authenticated receipt/identity and failed-health rollback proo
remain in ACTIVITY-WP-0041-T03. Digest-aware registry retention is tracked by
RPF-WP-0048-T03; current baseline tags are protected. Reporting is operational;
consumer enrollment and admitted pattern-editing execution remain unfinished.
## Closeout audit — 2026-09-27
Local frozen-publication prerequisite in T01 is complete: [release registry](../reference/releases.json),
explicit version selection and Git-pinned corpus/package reads isolate old exports
from legitimate current-research edits. Regression tests exercise current research
changing independently, stale live profiles and altered published artifacts.
Workplan blocked; T01/T02/T03 wait on their end-to-end dependencies. T01 needs hosted
discovery and common-template-owner integration into an actual eligible frontend task,
including its first pinned decision note. T02 needs the producer closeout hook and
real use plus linked outcome; activity-core owns the existing executable event validator
and deterministic collector. The roster is still empty. Do not invent a demo consumer
or copy its fixtures into the real stream. Reopen these tasks when an eligible actual
consumer and the template integration are available.
T03 needs an admitted, budget-enforced pattern-edit executor (GLAS-WP-0012 /
HFACT-WP-0001), authenticated standing release/rollback proof (ACTIVITY-WP-0041 T03),
and a real unassisted cycle with monthly packet. Reporting and collection are already
operational; their three schedules remain enabled. The first monthly packet remains
due October 1; missing consumer/executor evidence must be reported as such. This audit
does not disable schedules or conflate the reporting worker with mutation authority.
Existing owner work records retain all dependencies; no replacement workplan is opened.