Verify live reporting repair and monthly review readiness
Assistant: codex Assistant-Model: gpt-6-astra Assistant-Session: 01a0e738-9e15-7600-87e6-90dec3a7beef
This commit is contained in:
parent
58e8ef675e
commit
80dc3e5d85
11 changed files with 217 additions and 16 deletions
3
SCOPE.md
3
SCOPE.md
|
|
@ -103,7 +103,8 @@ improvement. It owns discovery, instrumentation and execution integration; month
|
|||
human review owns operating-policy decisions. The capability entry is prepared;
|
||||
automatic collection and three activity-core reporting schedules passed scheduled
|
||||
smoke checks; the first natural daily run failed after a worker image change removed
|
||||
the domain resolver. A tested repair is staged pending release authorization.
|
||||
the domain resolver. The approved grant-preserving repair is deployed and all three
|
||||
scheduled sink smokes pass; natural recurrence and October 1 evidence remain due.
|
||||
Hosted consumer integration and admitted pattern-editing execution remain blocked;
|
||||
there are no enrolled consumers yet.
|
||||
This operational loop can improve draft guidance without claiming M1/M2/M3 or
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue