FEP-WP-0002: finish with M1 revise/defer; hand off residual to FEP-WP-0009
Phase acceptance delivered (eight connected drafts, VC-01/VC-02, M1-SeedReview). Independent human review, fresh-scenario replication and M1 re-assessment move to residual FEP-WP-0009 (origin_ref FEP-WP-0002). WP-0003/0004/0008 dependencies now point to FEP-WP-0009-T03. M1 gate remains open. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Assistant: claude-code Assistant-Model: opus Assistant-Process: 260325@bnt-lap001 Assistant-Session: 9fd4a535-80cb-4d87-825e-ac95a9162531
This commit is contained in:
parent
1f86d4cd45
commit
a536ec52e0
9 changed files with 94 additions and 17 deletions
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Validate the seed frontend pattern language"
|
||||
domain: infotech
|
||||
repo: frontend-patterns
|
||||
status: active
|
||||
status: finished
|
||||
quality_dor: DoR-Ok
|
||||
quality_dor_at: "2026-09-24"
|
||||
quality_dor_by: codex
|
||||
|
|
@ -14,7 +14,7 @@ reviewed_against_commit: "c161369ad58782ff0a13429c61cc7c8efc36e33d"
|
|||
owner: codex
|
||||
topic_slug: canon
|
||||
created: "2026-09-23"
|
||||
updated: "2026-09-27"
|
||||
updated: "2026-10-03"
|
||||
state_hub_workstream_id: "3350b7f2-375a-54e8-8f7c-3bf7c7c3af71"
|
||||
---
|
||||
|
||||
|
|
@ -61,7 +61,7 @@ counterexamples. Reconcile README maturity claims with the evidence.
|
|||
|
||||
```task
|
||||
id: FEP-WP-0002-T03
|
||||
status: todo
|
||||
status: done
|
||||
priority: medium
|
||||
state_hub_task_id: "54940b04-1d0f-5bff-98d4-be290eca8048"
|
||||
```
|
||||
|
|
@ -358,3 +358,14 @@ core, two synthetic walkthroughs and review are delivered, but the gate is revis
|
|||
Reopen when independent evidence and the outstanding quality/recovery assumptions
|
||||
can be assessed; a metadata edit or another author-model review cannot supply it.
|
||||
Storage/receiver mechanism work already belongs to WP-0003 T04. No new task.
|
||||
|
||||
## Closeout with residual handoff — 2026-10-03
|
||||
|
||||
User directed closure against the phase acceptance. Delivered: eight connected
|
||||
hypothesis drafts (CAND-0001–0008), VC-01/VC-02 synthetic walkthroughs and
|
||||
[M1-SeedReview](../research/reviews/M1-SeedReview.md) with evidence per criterion;
|
||||
hypothesis maturity retained. T03 done; **M1 stays revise/defer, not passed.**
|
||||
Independent human review, fresh-scenario replication and the M1 re-assessment are
|
||||
handed off to [FEP-WP-0009](FEP-WP-0009-m1-independent-validation.md)
|
||||
(`origin: residual`, `origin_ref: FEP-WP-0002`). Dependencies in WP-0003, WP-0004
|
||||
and WP-0008 now point to FEP-WP-0009-T03. Storage/receiver work stays in WP-0003 T04.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue