Prepare activity-core feedback collection and reporting schedules

Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a0e241-8285-7a63-8c0c-51c9cb824dc3
This commit is contained in:
tegwick 2026-09-27 13:05:03 +02:00
parent 3fdbd12f9b
commit aa08c04a2c
7 changed files with 250 additions and 2 deletions

View file

@ -61,7 +61,7 @@ in this design session; hosted registration and consumer integration remain open
```task
id: FEP-WP-0008-T02
status: todo
status: progress
priority: high
lane: blue
state_hub_task_id: "49be8a8e-eaaf-5f1c-b4cd-f0c4dbac9823"
@ -88,7 +88,7 @@ refresh after 14 days and remain unknown after 30; no manual survey dependency.
```task
id: FEP-WP-0008-T03
status: todo
status: progress
priority: high
lane: blue
state_hub_task_id: "f823587c-727d-515a-974d-401719420ce5"
@ -142,3 +142,13 @@ design under the user mandate, not runtime activation or independent human valid
Local capability entry passes reuse-surface validation; reference, evolution and
classification checks pass, and changed Markdown links/whitespace were checked.
The receipt template is a draft contract; its executable schema/collector belong to T02.
## Activity-core setup — 2026-09-27
Domain-owned daily/weekly/monthly definitions and the empty consumer roster are
prepared. ACTIVITY-WP-0040 owns the tested read-only collector, worker overlay and
projected definitions. See [runtime status](../docs/ActivityCoreLoop.md). Definitions
remain disabled pending the estate deployment path and live sink verification.
GLAS-WP-0012 / HFACT-WP-0001 own the unverified execution profile; no fallback is
enabled. T02/T03 remain in progress: prepared schedules and reports do not satisfy
the real-consumer, admitted execution or publication acceptance criteria.