Prepare activity-core feedback collection and reporting schedules
Assistant: codex Assistant-Model: gpt-6-astra Assistant-Session: 01a0e241-8285-7a63-8c0c-51c9cb824dc3
This commit is contained in:
parent
3fdbd12f9b
commit
aa08c04a2c
7 changed files with 250 additions and 2 deletions
|
|
@ -61,7 +61,7 @@ in this design session; hosted registration and consumer integration remain open
|
|||
|
||||
```task
|
||||
id: FEP-WP-0008-T02
|
||||
status: todo
|
||||
status: progress
|
||||
priority: high
|
||||
lane: blue
|
||||
state_hub_task_id: "49be8a8e-eaaf-5f1c-b4cd-f0c4dbac9823"
|
||||
|
|
@ -88,7 +88,7 @@ refresh after 14 days and remain unknown after 30; no manual survey dependency.
|
|||
|
||||
```task
|
||||
id: FEP-WP-0008-T03
|
||||
status: todo
|
||||
status: progress
|
||||
priority: high
|
||||
lane: blue
|
||||
state_hub_task_id: "f823587c-727d-515a-974d-401719420ce5"
|
||||
|
|
@ -142,3 +142,13 @@ design under the user mandate, not runtime activation or independent human valid
|
|||
Local capability entry passes reuse-surface validation; reference, evolution and
|
||||
classification checks pass, and changed Markdown links/whitespace were checked.
|
||||
The receipt template is a draft contract; its executable schema/collector belong to T02.
|
||||
|
||||
## Activity-core setup — 2026-09-27
|
||||
|
||||
Domain-owned daily/weekly/monthly definitions and the empty consumer roster are
|
||||
prepared. ACTIVITY-WP-0040 owns the tested read-only collector, worker overlay and
|
||||
projected definitions. See [runtime status](../docs/ActivityCoreLoop.md). Definitions
|
||||
remain disabled pending the estate deployment path and live sink verification.
|
||||
GLAS-WP-0012 / HFACT-WP-0001 own the unverified execution profile; no fallback is
|
||||
enabled. T02/T03 remain in progress: prepared schedules and reports do not satisfy
|
||||
the real-consumer, admitted execution or publication acceptance criteria.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue