# Conformance reporting contract **Owner:** gate-house **Executor:** whitehat-security **Posture observer:** kings-guard **Finding triage:** risk-nexus **Status:** normative for GH-WP-0001-T06 **Version:** conformance-reporting.v1 **Date:** 2026-09-01 ## 1. Purpose This contract establishes how execution of a Gate House assurance specification returns to doctrine review. It preserves four distinct judgments: ```text Gate House specifies the invariant and executable target whitehat-security attacks and reports whether the observed control held risk-nexus owns finding severity, disclosure, and owner routing Gate House decides whether the result requires doctrine change ``` Gate House does not grade its own specification by reinterpreting a whitehat result, assign severity, close an implementation defect, or block delivery. ## 2. Report envelope Whitehat-security continues to use `whitehat-run/v1` as its native report. For Gate House conformance return, the report or a value-safe projection must also make these fields expressible: ```yaml schema_version: conformance-reporting.v1 report_id: specification: id: asm-assurance-targets.v1 test_id: T-03 target: component: revision: environment: claim: invariant_ids: [A-14, INV-05] engagement_id: authorization_id: run_id: outcome: pass | finding | inconclusive | aborted known_bad_calibration_ref: evidence_refs: [] emission_guarantee_refs: [] limitations: [] assurance_statement: returned_at: ``` The projection contains no credential value, secret, unrelated response body, severity, disclosure decision, or exploit detail unsafe for the recipient. ## 3. Outcome rules - Every outcome returns, including `pass`, because target revision and run date define the freshness of limited assurance. - `inconclusive` and `aborted` do not count as conformance. - A known-bad calibration that has never failed makes the target `inconclusive`, even if the real target probe reports no effect. - A changed target revision invalidates any claim that the earlier result is current unless the executor records why the change is immaterial. - Absence of a report is `not_run`, not `pass`. - A passing report states only that the recorded attacks did not cross the boundary under the recorded conditions. ## 4. Return transport The durable coordination envelope is a State Hub inbox message to `gate-house`: ```text Subject: [GH-CONFORMANCE] @ Body: report id, safe report/evidence references, specification version, run and authorization ids, limitations, and requested Gate House action ``` Large or sensitive evidence remains under whitehat-security/risk-nexus custody; the message carries stable references and a value-safe summary. The emitting repository records the report in its own work structure before sending the message. ## 5. Finding routes | Result | Required route | | --- | --- | | Implementation control failed | whitehat-security → risk-nexus → implementation owner; Gate House receives the safe conformance report. | | Doctrine is ambiguous, contradictory, unsafe, or impossible to test | whitehat-security or kings-guard → Gate House intake/message, citing test and evidence. | | Target or execution harness gap | whitehat-security owns or promotes the gap in its repository; Gate House records the test as pending. | | Posture, stream-silence, or live-observation gap | kings-guard owns or promotes the observation gap and returns the safe finding to Gate House. | | Severity/disclosure question | risk-nexus only. | One observation may take both the implementation and doctrine routes. The two records cross-reference one another; Gate House does not absorb the owner's remediation task. ## 6. Gate House review record For each returned report, Gate House records: - report, target, revision, test, and invariant identifiers; - whitehat outcome without changing it; - doctrine disposition: `no_change`, `clarify`, `revise`, `new_target`, or `withdraw_claim`; - any Gate House intake, decision, contract revision, or workplan produced; - implementation/risk-nexus reference where a control failed; - next review trigger: target revision, cadence date, or finding closure. A conformance review is complete when the result has an explicit doctrine disposition and every residual has a live owner. Closing a Gate House review does not close the underlying security finding. ## 7. Cadence and aggregation Cadence belongs to whitehat-security because the run interval is part of the attacker model and exposure window. Gate House may request a minimum review condition, but it must not label stale evidence current. Gate House may publish an aggregate conformance view only if it preserves: - target and revision specificity; - last executed and next due times; - outcome and limitations; - tests that are pending, inapplicable, inconclusive, or not run; - the audit completeness bound. An aggregate must not turn missing reports into green cells.