access-engine raised, and declined to solve locally, a hole in the split
GH-DEC-2026-005 ruled on. approval-claim verification item 4 is a
disjunction and neither limb delivers "approved for THIS request" on the
PDP path: limb one requires translating between two engines' vocabularies
and no mapping is published, limb two (pdp_digest) is optional. Where the
digest is absent a consumer can hold valid_now true, receive an ALLOW,
consume and act with nothing establishing that approval and decision
concern the same action and target.
Ruled: the PDP digest is the correspondence and is required on that path;
a claim without one fails closed; the native limb survives only for
consumers already in approval-engine's vocabulary, including T-06. No
mapping is published — a translation can be wrong while still producing a
confident answer, it fails open, it would be owned by neither engine, and
recomputing another layer's binding is the re-derivation GH-DEC-2026-005
already forbids. The cost is stated: an approval issued without a bound
CheckRequest is unusable on this path, which is correct behaviour.
Also: adopted hub row b606e8ce as canonical for GH-DEC-2026-005 rather
than registering a duplicate; recorded approval-engine's narrowing of the
approver-threshold consequence (distinctness is a UNIQUE storage
invariant, so the PEP stopped checking that the engine applied its own
invariant, not whether dual control could be forged); and drafted A7/T08,
a §11 marking obligation and §12 consumer rule for derived summaries,
after four instances in one week across four repositories.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01WtJBr77gMFLrN93iEevqQJ
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 425128@bnt-lap001
Assistant-Session: f5944d8b-dac4-4e1a-87eb-8b3d8f314a63