gate-house/workplans
tegwick 02a1dc1b9a Promote GH-IN-0001 to GH-WP-0002: approval evidence integrity
audit-core raised the intake with a drafted five-task plan and invited us to
promote it verbatim or revise. Adopted close to verbatim, plus a sixth task for
the consumption ordering contract flex-auth raised in the same round.

The omission gap is not accepted for approvals. v0.5 §9.6 distinguishes
load-bearing evidence from attributive; approvals are load-bearing, so emission
atomicity is required and the outbox must be local.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 2564823@bnt-lap001
Assistant-Session: 2a7ed827-4928-4b9f-8613-9135c9cadfe9
2026-08-29 02:56:11 +02:00
..
GH-WP-0001-foundation.md repo.work.update_task_status GH-WP-0001-T03 -> done 2026-08-28 22:01:01 +02:00
GH-WP-0002-approval-evidence-integrity.md Promote GH-IN-0001 to GH-WP-0002: approval evidence integrity 2026-08-29 02:56:11 +02:00