- State Hub workplan `65c03b24-4349-5a60-b7d6-79cf54931d06`: verified blocked.
- Existing T01 and T02 retain the remaining work.
## PQRST estimate
```text
PQRST-Estimate
P: 20%
Q: 25%
R: 40%
S: 0%
T: 15%
Sum: 100%
Confidence: medium
Signature: P20 Q25 R40 S0 T15
Dominant factors: Reviewing all 23 workplans, the rename handoff, and the earlier migration established the remaining scope; live URL probes, consistency checks, and Git readback verified the blocker and the recorded result.
Notes: The deliverable was the corrected blocked workplan and its evidence. Coordination and progress logging account for T; the closing ritual is excluded.
```
## Visual prompt
> Square precise technical illustration in the Hall of Helix constellation dialect: pale-gold wirework on deep dark indigo. An intimate workshop map viewed slightly from above, a small constellation of completed circular source plates surrounding a central registry ring. A single existing gold filament stays connected and luminous, while an adjacent proposed socket is visibly empty, its unfinished path ending cleanly before the ring. Two small unlit beads wait along that unfinished branch. Delicate drafting geometry, restrained warm light, generous negative space, calm attentiveness rather than triumph. The scene is about keeping a working source connected while honestly marking an unavailable replacement. No people, no logos, no readable text, no numbers, no watermark.
## Portrait

Generated with the built-in image generation tool from the prompt above.
## Handoff
Resume REUSE-WP-0023-T01 after FLEX-WP-0020's upstream rename makes the
access-engine raw index available and valid. Then update the source coordinates,
refresh and verify federation without changing the capability identifier, and
complete T02's hosted registration reconciliation. The source migration remains
unfinished. This review and its Git sync are complete.