finished with completion evidence and both operational follow-ups.
-`a8eb81d`: bootstrap closeout, verified declaration, and operating instructions.
-`ca39b2f`: separate migrations and bounded, accurate live smoke.
-`5c86aa3`: ordered prerequisites and failure-safe manifest assembly.
-`rapp-tenant-engine/tools/apply_manifests.sh` and
`rapp-tenant-engine/tests/test_operations.py`: the input boundary and its
regression evidence.
## PQRST estimate
```text
PQRST-Estimate
P: 30%
Q: 40%
R: 20%
S: 0%
T: 10%
Sum: 100%
Confidence: medium
Signature: P30 Q40 R20 S0 T10
Dominant factors: Separating migration and prerequisite execution from runtime rollout, adding failure-safe manifest assembly, and testing failure paths drove the implementation and quality work. Repository and schema inspection established the existing behavior; closing the bootstrap workplan and syncing its evidence accounted for organization.
Notes: Secret readiness was operational sequencing, not a change to credential handling or security controls. The closing ritual is excluded.
```
## Visual prompt
> Square precise technical illustration in the Hall of Helix constellation dialect: pale-gold wirework on deep dark indigo. A quiet workshop bench holds three distinct mechanisms in a deliberate sequence: a small foundation platform with two steady lamps, a separate migration wheel with its own fixed axle, and a reversible runtime rail. A gold return path bends back around the wheel without touching it. In the foreground a closed inspection tray holds a complete bundle of fine gold sheets; a broken sheet rests outside the tray and cannot enter the outbound conduit. A small ledger is closed beside the tools, with no writing visible. Mood: patient accountability, a worker learning to check the path before declaring the ledger closed, and then setting the tools down. Restrained warm light, elegant spatial clarity, dark negative space, no logos, no readable text, no watermark.
## Portrait

## Handoff
The requested repository work is finished, committed, and pushed. No new tasks
or workplans were opened. A fresh-install and rollback rehearsal in a disposable
environment remains unperformed; mocks and live read-only checks are the actual
evidence. The next action for this session is to put the tools down.