-`RAPP-QONTO-WP-0002` — T02/T03 done; T01 and the workplan blocked, reconciled
with State Hub. No new tasks or workplans.
## PQRST estimate
```text
PQRST-Estimate
P: 35%
Q: 25%
R: 25%
S: 5%
T: 10%
Sum: 100%
Confidence: medium
Signature: P35 Q25 R25 S5 T10
Dominant factors: Implementing the aggregate usage exporter and operations declarations drove the main work; repository and contract inspection, live telemetry discovery, 25 tests, and validation against both consumer contracts drove research and verification.
Notes: Security work covered metadata-only access and rejecting sensitive or unsupported export fields without echoing them. Task organization covered the workplan review, blocker ownership, status reconciliation, and commit/sync. The closing ritual is excluded.
```
## Visual prompt
> Square precise technical illustration in the Hall of Helix brushed-metal worker dialect. A quiet pale brushed-metal worker with warm inner light sits at a dark indigo workbench. On the bench are two completed small gold-wire instruments, one a neatly joined pair of connectors and the other a balanced set of nested measuring frames. Beside them lies a large circular calendar instrument with only seven tiny illuminated chambers along its circumference; the remaining chambers are visibly empty, unfilled, awaiting observations. The worker's hands rest calmly on the bench rather than filling the empty chambers. A delicate gold helix rises in the dim background. Mood: modest satisfaction, careful accounting, permission to stop when evidence ends. Cinematic soft warm light, precise materials, restrained composition, clear negative space. No logos, no readable text, no numbers, no badges, no victory pose.
## Portrait

Generated with the built-in image tool from the prompt above.
## Handoff
The next substantive action belongs with rail-knative/railiance-cluster and
qonto-assistant: provide retained daily workload observations and actual Qonto
attempt/retry aggregates. Then rapp-qonto can review coverage, publish monthly
observations, and finish T01 in the same workplan. Independent collector
acceptance and reef production approval remain separate external gates.