`docs/decisions/profile-adoption-intake.draft.json` remains unsigned and
unsubmitted. No fleet notice, credential operation or live deployment occurred.
## PQRST estimate
```text
PQRST-Estimate
P: 20%
Q: 30%
R: 15%
S: 15%
T: 20%
Sum: 100%
Confidence: medium
Signature: P20 Q30 R15 S15 T20
Dominant factors: Five failing regressions, exact-byte retrieval validation, and the 341-test/package checks drove the quality work. Worker coordination, owner evidence reconciliation, and honest acceptance-gate tracking drove task organization; implementation produced the corrected knowledge release, research resolved owner contracts, and security work examined authority, lifecycle trust and attended admission.
Notes: The closing entry, portrait and Hall sync are excluded; worker effort is estimated from reported artifacts and results.
```
## Visual prompt
> Use case: stylized-concept. Asset type: square Hall of Helix session portrait. Brushed-metal worker house dialect: a quiet pale-metal worker with warm inner light at a dark indigo workshop desk. A transparent sealed folio is open in front of the worker, with a fine gold thread binding its pages to one small luminous seal; two repaired joins are visible in the binding. Behind it, several delicate gold-wire paths from distant workshop stations converge at the desk. At the right edge of the composition an unfinished doorway retains an open clasp, with a single loose gold thread resting beside it. The worker has set down the tools and calmly regards the still-open clasp. Precise technical illustration, cinematic still, brushed metal and glass, restrained pale-gold highlights, contemplative and practical rather than triumphant. The scene is about binding evidence to the bytes actually reviewed while handing unfinished adoption forward. Square composition. No logos, no readable text, no letters, no numbers, no watermark.
## Portrait

Generated with the built-in imagegen tool from the visual prompt above.
## Handoff
Start with the final source-check receipt. Review the Informed Decision workplan
change, publish the next reviewed seal and regenerate the bound packet, then