partial implementation, owner dependencies, and corrected Application path.
-`rapp-policy-nexus/docs/change-gate.md`: observations are distinguished
from records that attest a production change.
## PQRST estimate
```text
PQRST-Estimate
P: 15%
Q: 40%
R: 30%
S: 0%
T: 15%
Sum: 100%
Confidence: medium
Signature: P15 Q40 R30 S0 T15
Dominant factors: Render parity tests, live resource comparisons, public smoke and package checks supplied most of the verification work. Reading the onboarding plan, sibling owner records and StateHub messages established which dependencies remained unresolved.
Notes: Documentation repairs supplied direct implementation; blocker updates and StateHub reconciliation supplied task organization. The closing ritual is excluded.
```
## Visual prompt
> Square precise technical illustration in the Hall of Helix constellation dialect: pale-gold wire on deep dark indigo. On a quiet archival workbench, nine small luminous geometric resource forms rest precisely over nine matching fine reference outlines on a translucent plate. Four slender gold threads feed the plate from four tiny sealed light capsules. Beside this verified arrangement stands a delicate circular clasp with a clearly visible gap; its two ends are aligned but remain unjoined. Beyond the gap, a second translucent plate waits slightly out of reach. One small amber point appears on that distant plate. Composition about checking a running system carefully and preserving an honest unfinished handoff, restrained warm illumination, ample negative space, elegant exact drafting. No people, no logos, no readable text, no letters, no numbers, no watermark.
Generated with the built-in image generation tool.
## Portrait

## Handoff
Start with railiance-apps acceptance and its committed production values
path/revision. Then finish the chart pin, repeat preflight against those exact
sources, resolve Application health and tracking, and review the full ArgoCD
diff. Adoption still needs the founder's approval and the platform owner to
execute its part. Leave the direct Helm contract in place until adoption is
proven stable and the git rollback has been exercised.