- Existing live acceptance owners: RPF-WP-0035-T02, SECRETS-WP-0008-T06, SECRETS-WP-0006-T06 and SECRETS-WP-0009-T03.
## PQRST estimate
```text
PQRST-Estimate
P: 15%
Q: 20%
R: 25%
S: 30%
T: 10%
Sum: 100%
Confidence: medium
Signature: P15 Q20 R25 S30 T10
Dominant factors: Reviewing existing owner contracts and receipts exposed the mistaken Coulomb tenant assignment; correcting KeyCape registrations, OpenBao role bindings and consumer preflight dominated the security work. Regression suites and contract checks established source correctness, while workplan reconciliation preserved the remaining live acceptance gates.
```
## Visual prompt
> Square 1024x1024 precise technical illustration in the Hall of Helix constellation dialect: pale-gold wirework against deep dark indigo. A broad circular foundation supports a small central vault and several independent miniature workshop constellations above it. A quiet pale-gold drafting hand is lifting a single misrouted wire from one peripheral workshop and reconnecting it to the foundation's central ring; the peripheral workshop stays intact and illuminated. Beside the foundation, three carefully aligned transparent technical plates show matching geometries, but one displaced joining pin reveals that agreement alone was insufficient. At the far right an unfinished, unlit connector waits across a narrow gap, clearly separate from the completed source plates. Restrained warm light, generous negative space, precise architectural linework, calm accountable mood. The scene is about correcting platform ownership after accepting a human clarification, while leaving live acceptance visibly unfinished. No readable text, letters, numbers, logos, watermark, badges or victory pose.
## Portrait

## Handoff
Use the platform review's coordinated migration sequence: inspect live
registration and role metadata, deploy the exact platform tenant bindings,
verify new-token success and old/wrong-tenant refusal, and revoke affected
issued tokens with owner-held evidence. Keep workload grants bounded. That
acceptance remains in the existing tasks above.
The npm cutover and fresh Glas-specific approvals/native delivery are also
unfinished. Concurrent Glas activation edits were left untouched. This seat