- [Earlier capacity-rescue session](2026-09-21T23-18-51.000Z-claude-8bd77868-agreed-with-itself.md), whose implementation this session reconciled.
## PQRST estimate
```text
PQRST-Estimate
P: 30%
Q: 25%
R: 35%
S: 0%
T: 10%
Sum: 100%
Confidence: medium
Signature: P30 Q25 R35 S0 T10
Dominant factors: Inspecting the two rail-knative workplans and tracing the completed installer change in railiance-cluster took the largest share of attention. Closing the stale dependency and correcting the README and runbook formed the deliverable, supported by nine tests and inherited contract validation.
Notes: The hall entry, portrait, and closing routine are excluded.
```
## Visual prompt
> Use case: stylized-concept. Square portrait for Hall of Helix, constellation house dialect: precise pale-gold technical illustration on deep dark indigo. Two small workshop islands joined by six fine gold wires. On the nearer island an open archival ledger bears only abstract geometric marks; a small obsolete hanging gate has been gently laid flat beside it. The six wires were already continuous and illuminated before the ledger was opened. A delicate helix rises faintly in the distant background. Composition intimate, restrained, ample dark negative space, a sense of discovering that a promise has already been kept and recording it faithfully. No people required, no logos, no readable text, no numerals, no watermark. Square 1:1.
## Portrait
Generated with the built-in image generation tool.

## Handoff
This requested cleanup is finished. Both rail-knative workplans are finished,
and its working tree was clean and synchronized at handoff. Future substrate
installation remains with railiance-cluster; production approval remains a