Add hall seat: glas-harness loose-ends review found nothing left to build
Closed the glas-harness session: every open workplan (GLAS-WP-0012, GLAS-WP-0015) is blocked on external owner deliverables, and no new owner return has landed since 2026-09-23. Records that as a draft seat awaiting its portrait. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Assistant: claude-code Assistant-Model: sonnet Assistant-Process: 304780@bnt-lap001 Assistant-Session: 9386e09e-a134-4462-ba17-2a29deef7b43
This commit is contained in:
parent
326f440422
commit
16e2f0c162
2 changed files with 138 additions and 0 deletions
|
|
@ -273,6 +273,7 @@ Grouped by the work they share. Chronology is in the filenames.
|
|||
- [Claude — drafted work closed quietly, 2026-09-27](entries/2026-09-27T21-25-00Z-claude-67a5ec6e-drafted-work-closed-quietly.md) — draft, awaiting its portrait
|
||||
|
||||
- [Claude — loose ends into one honest "blocked", 2026-09-27](entries/2026-09-27T21-28-18Z-claude-loose-ends-into-one-honest-blocked.md) — draft, awaiting its portrait
|
||||
- [Claude — nothing left but the waiting, 2026-09-27](entries/2026-09-27T21-31-44Z-claude-glas-harness-nothing-left-but-the-waiting.md) — draft, awaiting its portrait
|
||||
|
||||
### Open seats
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue