STATE-WP-0079 is blocked on this plan: Wave B of the State Hub cutover slice
plan is 125 inventory items and none can start while this sits at proposed.
It is currently the largest single gate in the retirement program.
Reviewed against current repo state -- nothing structurally prevents ready.
The plan has been unreviewed since 2026-08-09 rather than blocked. All
referenced architecture artefacts exist in prj-state-hub-retirement, and T01
is a review task whose inputs are available, so it can start immediately.
Fixes the architecture citation: the path is project-relative, but reads as
hub-core-relative and hub-core has no architecture/ directory.
Records that port.* appears nowhere in hub-core outside this workplan, and
that two of T04's five ports have no existing basis -- the minimal vertical
is partly greenfield and worth sizing first.
Status left at proposed for the owner to flip.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>