Archive probe repo after CORE-WP-0007-T01
Mark the IHP pipeline-validation probe archived, preserve diagnostic docs, move IRP-WP-0001 to workplans/archived/, and disable push-triggered CI.
This commit is contained in:
parent
efe88a0133
commit
fafbeabe72
6 changed files with 45 additions and 13 deletions
12
INTENT.md
12
INTENT.md
|
|
@ -59,5 +59,13 @@ means:
|
|||
- A new IHP project can be promoted to production without the build archaeology
|
||||
that inter-hub required.
|
||||
|
||||
Once the pipeline is validated, the probe continues to serve as a **regression
|
||||
canary**: rebuild it whenever the flake lock is updated before touching inter-hub.
|
||||
Once the pipeline is validated, the probe continued as a **regression canary**
|
||||
until Core Hub replaced the production interaction framework.
|
||||
|
||||
## Retirement (2026-07-07)
|
||||
|
||||
Archived per `CORE-WP-0007-T01` after `IRP-WP-0001` completion and Core Hub
|
||||
production cutover (`CORE-WP-0005-T04`, 2026-07-03). The probe's diagnostic
|
||||
value is preserved in this repo's docs and workplan archive; no further builds
|
||||
or deployments are expected. Haskell build-lane retirement continues in
|
||||
`CORE-WP-0007-T03`.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue