The SecurityCanon boundary review recorded a residual: CARING and ITC-ACCESS
hold two definitions of Scope, with ITC-ACCESS named owner. Reading the corpus
corrects both halves. ITC-IDENT section 2.10 owns Scope as the general boundary
within which identifiers, meanings, relationships, accounts, policies or
lifecycle states are valid, and ITC-ACCESS section 11.8 ResourceScope already
declares itself a refinement of that general identity Scope rather than a
competing definition.
The second use the residual was reaching for is CARING section 21, which
presented a dimension named Scope with a ladder from Ecosystem to Field without
saying what the dimension ranges over. It now states that it ranges over
ITC-IDENT Scope instances, that the ladder is the canonical value set rather
than a second definition, and that ResourceScope refines the same concept for
resource boundaries.
No concept is renamed, moved or removed and no ladder value changes, so the
corpus is unchanged in shape; make check passes with 46 tests, clean validation
and a passing small-saas profile. The correction is carried back to the
SecurityCanon placement record and imports.json, where Scope now imports from
the identity model.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 3588@bnt-lap001
Assistant-Session: 24b80f66-e5a7-4e61-99fe-2d422e6d17da
Register the InfoTechCanon Repository Layout Standard as a domain standard
(itc-repo-layout), processed from demand through the canon's Purpose/Demand
intake without collapsing existing model concepts.
- Register standard in artifacts/index.yaml, canon.yaml, infospace.yaml;
regenerate indexes, views, briefs, tree, and validation (validate green).
- T04: add reconciliation.yaml (partial/as-is dogfooding, declared core
conformance, recorded tensions); resolve the demand by moving it out of
demand/ to the evaluation pack as source-demand.md and removing demand/.
- T05: add consumer-adoption-brief.md for downstream repos.
- Update test artifact/standard counts (60->61, standards 2->3).
- Mark T03/T04/T05 done; workplan and registry status -> finished.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>