Commit graph

3 commits

Author SHA1 Message Date
d453e17952 Canon 0.6.0 freeze: ITC-CAP draft, AVT catalog, joinable review
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s
Finish ITC-WP-0013 (AttributeValueType under ITC-DATA) and ITC-WP-0014
T02/T03/T05/T06/T07. Capability contract schemas, live-catalog review
CLI, landscape/kernel-map pointers. Sit on this version.
2026-08-15 19:42:30 +02:00
f7ad73d9da ITC-WP-0012: integrate Repository Layout Standard
Register the InfoTechCanon Repository Layout Standard as a domain standard
(itc-repo-layout), processed from demand through the canon's Purpose/Demand
intake without collapsing existing model concepts.

- Register standard in artifacts/index.yaml, canon.yaml, infospace.yaml;
  regenerate indexes, views, briefs, tree, and validation (validate green).
- T04: add reconciliation.yaml (partial/as-is dogfooding, declared core
  conformance, recorded tensions); resolve the demand by moving it out of
  demand/ to the evaluation pack as source-demand.md and removing demand/.
- T05: add consumer-adoption-brief.md for downstream repos.
- Update test artifact/standard counts (60->61, standards 2->3).
- Mark T03/T04/T05 done; workplan and registry status -> finished.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 14:25:54 +02:00
c112bf5c74 Add validation indexes and generated views 2026-05-23 03:32:16 +02:00