16 lines
860 B
Markdown
16 lines
860 B
Markdown
|
|
# Scheduling status and prompts
|
||
|
|
|
||
|
|
Repository scheduling status: **not configured**. The source Grok archive contains
|
||
|
|
external task/schedule UUIDs; ownership and execution were not verified. They are
|
||
|
|
historical references only. No app notifications or email have been enabled here.
|
||
|
|
|
||
|
|
Daily operator prompt: Review the watchlist for primary-source changes since the
|
||
|
|
previous pass. Record evidence with provenance, publication/event and observation
|
||
|
|
timestamps. Generate a draft for the event date, review each claim and mark gaps.
|
||
|
|
|
||
|
|
Weekly operator prompt: Generate the ISO-week draft. Synthesize decision-relevant
|
||
|
|
changes, unresolved contradictions, frontier evidence gaps, compendium edit proposals,
|
||
|
|
and benchmark health. Link observation IDs. Do not pad an empty week with invented news.
|
||
|
|
|
||
|
|
IR-WP-0003 tracks source adapters and an explicitly configured scheduler.
|