chore(consistency): sync task status from DB [auto]

Updated by fix-consistency on 2026-09-28:
  - update .custodian-brief.md for intelligence-radar

Assistant: claude-code
Assistant-Model: sonnet
Assistant-Process: 237582@bnt-lap001
Assistant-Session: f2b3d9f1-8fb9-4b9c-bc2b-837ec5dfc826
This commit is contained in:
custodian-sync 2026-09-28 23:38:55 +02:00
parent 9bcc20e3f9
commit 737598f639

View file

@ -1,24 +1,41 @@
<!-- custodian-brief: generated by fix-consistency — do not edit manually -->
# Custodian Brief — intelligence-radar
Updated: 2026-09-14. Domain infotech; topic custodian.
**Domain:** infotech
**Last synced:** 2026-09-28 21:38 UTC
**State Hub:** http://127.0.0.1:8000 *(adjust if running on a remote machine)*
IR-WP-0001–0004 are finished. IR-WP-0004 closed at user request after transferring
unfinished scope into live follow-ups; its original incomplete tasks are cancelled
as transferred, not reported as successful.
## Active Workstreams
- IR-WP-0005: credential delivery, coordinating SECRETS-WP-0010-T03. Existing Bao
key and three completed human approvals remain the starting point; native login/
delivery evidence is still pending. Do not repeat approvals or expose secrets.
- IR-WP-0006: billing reconciliation and durable settlement procedure. USD 0.023712
remains reserved in ir-openrouter-pilot-20260913; total authorization is USD 10.
- IR-WP-0007: comparable profile evidence, representative field outcomes,
publication and decomposition. Paid trials require both 0005 and 0006 readiness.
### Complete comparable evidence, field outcomes and publication
Progress: 0/4 done | workplan_id: `e75cf5ae-3df2-507e-8fa3-8de687137623`
Delivered: local v0.2 advisor/capture/scheduling, portable bundles, controlled trial
runner and no-network plans, public catalog adapter and retained source evidence.
40 tests and repository/archive checks pass. Public model listing does not prove
requester access or benchmark comparability; no real trial/calibration claimed.
**Open tasks:**
- ! Collect and assess representative field outcomes `d78ac4b1`
*(wait: Paid execution needs both credential readiness (IR-WP-0005-T02) and budget readiness (IR-WP-0006-T03).)*
- ! Compare decomposition with measured monolithic execution `e36910d6`
*(wait: No matched held-out outcome evidence until T02 resolves.)*
- · Complete reviewed publication and operational disposition `314f79fd`
- · Establish comparable execution-profile evidence `8d4a62c6`
Read INTENT → GOAL → SCOPE → AGENTS → docs/data-contracts.md → workplans.
Closure mapping: workplans/IR-WP-0004-evidence-coverage-and-field-calibration.md.
Evidence review: docs/evidence/2026-09-14-ir-wp-0004-review.md.
### Reconcile trial billing and establish campaign accounting
Progress: 2/3 done | workplan_id: `b877f5e2-0c0e-5bca-9082-873eab857ada`
**Open tasks:**
- ! Reconcile the outstanding reservation and hand off budget readiness `441dc053`
*(wait: No authoritative provider billing evidence for the pending run yet; expected via the IR-WP-0005 admitted read-only path.)*
### Deliver admitted OpenRouter credentials to Radar
Progress: 1/2 done | workplan_id: `624750a5-d613-5e32-a656-595de03ef73c`
**Open tasks:**
- ! Verify scoped delivery and return readiness `c4b2378a`
*(wait: Human acceptance of three apply/verify/exec approvals for the pinned intelligence-radar-key-check recipient; secrets-engine opens them.)*
---
## MCP Orientation (when available)
If the state-hub MCP server is reachable, call:
`get_domain_summary("infotech")`
This provides richer cross-domain context.
If the MCP call fails, use this file as your orientation source.