chore(workplans): close WP-0014, WP-0015, WP-0017 as done
All three active inter-hub workplans are complete: - WP-0017: all E1–E5 done (clean build, 615 modules) - WP-0014: A1–A5 done (smoke test passed on haskelseed 2026-04-29) - WP-0015: B1–B7 done (static pages live, root route fixed) Release: v0.2.0-alpha.1 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
parent
ad7c938bfa
commit
7c85b1ed5a
3 changed files with 21 additions and 21 deletions
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Local Deployment — Intro and Tutorial Web UI"
|
||||
domain: inter_hub
|
||||
repo: inter-hub
|
||||
status: open
|
||||
status: done
|
||||
owner: custodian
|
||||
topic_slug: inter_hub
|
||||
created: "2026-04-03"
|
||||
|
|
@ -73,11 +73,12 @@ Add "Docs" / "About" / "Tutorial" links to the existing nav bar in
|
|||
`Web/FrontController.hs`. Add "Management" link pointing to `/hubs`.
|
||||
Ensure the nav is accessible from all static pages without requiring login.
|
||||
|
||||
### B7 — Final deployment run and verification
|
||||
With WP-0014 complete: confirm `devenv up` is clean, log in as admin, walk
|
||||
the full intro → capabilities → tutorial flow, enter the management UI,
|
||||
create a test hub, verify all dashboards load. Document the local URL, admin
|
||||
credentials location, and any operational notes.
|
||||
### B7 — Final deployment run and verification ✓
|
||||
Verified 2026-04-29 on haskelseed (192.168.178.135:8080):
|
||||
- / → Landing (200), /capabilities (200), /tutorial (200), /extension-guide (200)
|
||||
- Login as admin@inter-hub.local succeeds, all dashboards load
|
||||
- Root route fix: parseRoute' changed from endOfInput to string "/" >> endOfInput
|
||||
- Tagged v0.2.0-alpha.1
|
||||
|
||||
## Exit Criteria
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue