Commit graph

7 commits

Author SHA1 Message Date
97d0739537 docs: ADR-007 and FDA playbook; finish WP-0009 (T11)
Some checks failed
CI Smoke / host-smoke (push) Successful in 1s
CI Smoke / container-smoke (push) Successful in 1m12s
ci / test (push) Has been cancelled
Absorb railiance01 pilot supplier notes into the forward-deployed engagement
playbook, accept ADR-007 elevating DEC-FDA-001, promote architecture and
business model to v1.0, and mark KAIZEN-WP-0009 finished.
2026-07-16 12:44:56 +02:00
6ca167ce19 ops: complete host-operator ramp-up on railiance01 (WP-0009 T10)
Some checks failed
CI Smoke / host-smoke (push) Successful in 1s
CI Smoke / container-smoke (push) Successful in 36s
ci / test (push) Failing after 3m41s
Live observe session verified SSH access, captured baseline and Critical
health/load findings (memory pressure, k3s API unavailable). RU checklist
closed; engagement phase operating; schedule enabled; no privileged changes.
2026-07-16 12:43:00 +02:00
4532196546 feat: engagement close-session wires vault, metrics, Kai ledger (WP-0009 T09)
Some checks failed
CI Smoke / host-smoke (push) Successful in 1s
CI Smoke / container-smoke (push) Successful in 9m26s
ci / test (push) Failing after 4s
Add close_session helpers and CLI to append vault session logs, engagement-
scoped metrics, duty Kai charges, and client reports. Rejects sensitive
summaries. Pilot smoke-closed once; prepare points operators at close-session.
2026-07-16 12:09:05 +02:00
ad5965be91 feat: engagement CLI for forward-deployed agency (WP-0009 T08)
Add kaizen-agentic engagement subcommands (list, show, validate, checklist,
phase, prepare, staff, quote, scrub, export-handoff) backed by engagement.py
for file-based pilot lifecycle. Tests cover staff/validate/phase/prepare and
the railiance01 pilot smoke path.
2026-07-16 11:20:52 +02:00
2d347d062f feat: Phase 1 FDA host-operator Role and railiance01 pilot (WP-0009 T02–T07)
Some checks failed
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s
ci / test (push) Failing after 9s
Lock DEC-FDA-001 working defaults; add roles/host-operator package with
OS/security and load protocols; scaffold eng-coulomb-railiance01-ho-001
with bound agent, vault, ramp checklists, and Kai quote/ledger.
2026-07-16 10:47:52 +02:00
c8dfcd463a chore: hub writeback for KAIZEN-WP-0009 registration
State Hub C-06 created workstream and tasks; write state_hub IDs into
the workplan file and refresh .custodian-brief.md.
2026-07-16 10:35:46 +02:00
e0d7b0c3ad docs: forward-deployed agency model, architecture, and WP-0009
All checks were successful
CI Smoke / host-smoke (push) Successful in 1s
CI Smoke / container-smoke (push) Successful in 54s
Add Kai trial-currency business model and engagement architecture
(request → bound agent → ramp-up/down, client vault). Register workplan
KAIZEN-WP-0009 for host-operator@railiance01 pilot and CLI/ledger phases.
2026-07-16 10:28:58 +02:00