--- id: KAIZEN-WP-0014 type: workplan title: "Repository documentation, execution, and custody consolidation" domain: agents repo: kaizen-agentic status: finished owner: codex topic_slug: repository-consolidation created: "2026-08-20" updated: "2026-08-20" --- # Repository documentation, execution, and custody consolidation Bring the public repository description, capability registration, automated execution documentation, and remaining pilot evidence custody into agreement with the implemented Kaizen Agentic architecture. ## Register and baseline the workplan ```task id: KAIZEN-WP-0014-T01 status: done priority: high ``` Register this file-first workplan through State Hub consistency tooling and capture the current repository baseline before making changes. ## Refresh repository-facing documentation ```task id: KAIZEN-WP-0014-T02 status: done priority: high ``` Update the README and related repository-facing descriptions to reflect the current release, packaged agents, CLI surfaces, governance model, and integration boundaries. ## Refresh capability registration metadata ```task id: KAIZEN-WP-0014-T03 status: done priority: high ``` Align the capability record and capability index with the agents domain and the current memory, metrics, scheduling, role, engagement, and downstream-consumer surfaces. Normalize the repo classification to canonical capability-family tags. ## Document the current scheduled-execution contract ```task id: KAIZEN-WP-0014-T04 status: done priority: high ``` Update the activity-core integration material to describe the durable `ops_run` and rein-aharness execution path while retaining manual execution as a supported fallback. ## Resolve pilot-vault custody ```task id: KAIZEN-WP-0014-T05 status: done priority: high ``` Assess the Railiance pilot evidence, define its present classification and owner, select the appropriate client-side custody target, and establish a safe handoff contract. Do not move or delete client material until the receiving repository accepts custody. ## Validate and close out ```task id: KAIZEN-WP-0014-T06 status: done priority: high ``` Run repository validation, synchronize file state into State Hub, record progress, and publish the completed work. Validation completed with repository standards, lint, and the full test suite: 152 passed and 2 existing optional-integration skips.