Record the owner decision: Qonto rotation deferred, not refused
The repository owner declined to schedule the rotation now. Recorded with the reasoning rather than as a bare status so it is revisited on evidence instead of re-litigated: nothing indicates compromise, the offer stands open, and one founder-attended window is already pending for the fail-closed startup changes. Names what should reopen it -- an actual or suspected exposure, the secret's age becoming a stated concern, a consumer requiring proof of rotation, or a decision to prove rotation step 4 before relying on it -- and says plainly that a calendar date is not one of them. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_016uV8zoCKpA1WRAxsKRYbdH Assistant: claude-code Assistant-Model: opus Assistant-Process: 1182213@bnt-lap001 Assistant-Session: 966597b9-ae61-46a4-8b9e-1594ab3ec4ad
This commit is contained in:
parent
ed67780da8
commit
324b5e056d
1 changed files with 20 additions and 0 deletions
|
|
@ -309,3 +309,23 @@ If the rotation is scheduled, it is also the first opportunity to close the
|
|||
`real_predecessor_rotation_tested: false` gap recorded above — `verify-client`
|
||||
with `-previous-secret-env` is exactly step 4, and the predecessor would finally
|
||||
be genuinely distinct.
|
||||
|
||||
**Decision, 2026-09-10: not yet.** The repository owner declined to schedule the
|
||||
rotation now. Recorded with the reasoning so it is revisited on evidence rather
|
||||
than re-litigated from scratch: nothing indicates compromise, the offer stands
|
||||
open, and the estate already has one founder-attended window pending for the two
|
||||
fail-closed startup changes. Rotating for hygiene alone, in a second attended
|
||||
session, against a credential with no incident attached, is work the owner chose
|
||||
not to spend now.
|
||||
|
||||
This is a deferral, not a refusal, and the thing that should reopen it is a
|
||||
change in evidence rather than the passage of time: an actual exposure or
|
||||
suspected one (see KEY-WP-0011), the Qonto secret's age becoming a stated concern,
|
||||
a consumer requiring proof of rotation, or a decision to prove rotation step 4
|
||||
before relying on it elsewhere. Any of those makes the answer different; a
|
||||
calendar date does not.
|
||||
|
||||
T04 therefore stays `wait` with nothing outstanding from any counterparty. The
|
||||
authority is answered, the transport named, the CCR offered on request, and
|
||||
`verify-client` is ready for step 4 whenever a window is chosen. Nobody is waiting
|
||||
on KeyCape, and KeyCape is waiting on a decision that has now been taken.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue