MAS-WP-0005-T01: SCP-1..7 accepted; T01 done

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 252470@bnt-lap001
Assistant-Session: ad628c8f-4be2-4979-94c9-76c7ed6f8241
This commit is contained in:
tegwick 2026-10-18 18:06:14 +02:00
parent b30ce58f59
commit 6ee9e4dd54
2 changed files with 9 additions and 4 deletions

View file

@ -1,6 +1,8 @@
# MAS v0.1 spec change proposals (from MAS-WP-0002/0003)
Status: **draft for review**. These are proposals against
Status: **accepted by the founder (2026-10-18)**: SCP-1 to SCP-7 as written
below, including the decisions recorded under SCP-2 and SCP-6.
Implementation is tracked in MAS-WP-0005. These are proposals against
`mas-v0.1-spec/`. The spec bundle stays unchanged until they are accepted,
because `mas_conformance/` and `mas_core/schema/` are vendored copies and
the tests check them for drift. Evidence references point to

View file

@ -26,7 +26,7 @@ copies, the fixtures and the implementation together.
```task
id: MAS-WP-0005-T01
status: progress
status: done
priority: high
state_hub_task_id: "10c0433a-9b25-5b62-987f-2be7e9d49df2"
```
@ -60,8 +60,11 @@ SCP-6 split rules), and record which proposals are accepted.
(`alternate_syntax: {resource: true, interaction: true}`). Matching
order: interaction (`---MODE` at the end, enabled mode) first, then
resource (`TYPE--ID`). IDs must not contain `---` when the interaction
stand-in is enabled. Remaining T01 items: confirm SCP-1, SCP-3, SCP-5
and SCP-7 as written.
stand-in is enabled.
- 2026-10-18: SCP-1, SCP-3, SCP-5 and SCP-7 confirmed as written. All seven
proposals are accepted, so T01 is done. T02 implements the v0.1.1
errata (SCP-1, SCP-2 (a), SCP-3, SCP-5, and the SCP-7 recommendation);
T04 implements SCP-6 and the SCP-7 statute field for v0.2.
## v0.1.1 errata