Add an on/off switch for the MAS facility.

MAS-WP-0007 is finished. power.sh scales the MX and statute together
and records the power annotation. apply.sh keeps an off facility off.
The live facility was annotated power=on and was not restarted.

Assistant: grok
Assistant-Session: 01a198fa-fd27-7e41-a0a2-57355c3e4efd
This commit is contained in:
tegwick 2026-11-01 22:46:46 +01:00
parent b108e89af4
commit f18eb0b8df
12 changed files with 344 additions and 36 deletions

View file

@ -687,7 +687,8 @@ multimodal framework itself are out too.
3. v0.2 is declared final, or is withdrawn with recorded reasons;
4. the handoff reading of P2 is recorded in the v0.2 spec text, and the
address spec points to the mode contract;
5. the live test environment is retired, with its evidence archived;
5. the MAS facility can be turned off and back on, keeping its evidence,
credentials, and DNS;
6. mode contract v0.1 is published with JSON schemas and fixtures;
7. the email mode reference passes them in both roles: as master against
the callback stub, and as slave under the stub outside master;