# Posture Feedback Example `expired-e2.yaml` is deliberately valid as a posture declaration while carrying expired E2 evidence at the example evaluation time. It also has posture and zone reviews due within 14 days, an E3 control awaiting evidence, and one declared retention gap. The evaluator reports these as proposals and performs no mutation: ```bash uv run tools/posture-feedback/posture_feedback.py \ --as-of 2026-08-23T12:00:00Z \ --horizon-days 14 \ --fail-on none \ examples/posture-feedback/expired-e2.yaml ```