Enforce readiness tiers and reconcile blocked workplans

Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a0e75a-fc5c-7913-9dba-9846210c766d
This commit is contained in:
tegwick 2026-09-28 11:40:57 +02:00
parent 370e1f84c7
commit 36445ae679
14 changed files with 652 additions and 39 deletions

View file

@ -4,13 +4,12 @@ type: workplan
title: "Construct the fluid-telegram operator credential lane"
domain: infotech
repo: ops-mason
status: proposed
status: blocked
flavor: planning
owner: codex
topic_slug: helix-forge
created: "2026-09-04"
updated: "2026-09-04"
state_hub_workstream_id: "483e56d6-6601-5377-9066-66225214c046"
updated: "2026-09-28"
state_hub_workstream_id: "483e56d6-6601-5377-9066-66225214c046"
---
@ -65,7 +64,7 @@ from the current disk-only survey.
```task
id: MASON-WP-0005-T02
status: todo
status: wait
priority: high
state_hub_task_id: "69c558d9-664f-5ce0-80b2-d2e7544353a3"
```
@ -86,7 +85,7 @@ parent access, and the create-only salt shape.
```task
id: MASON-WP-0005-T03
status: todo
status: wait
priority: high
state_hub_task_id: "48a2b4ec-8e66-5b98-b039-c17fd8d820ab"
```
@ -103,7 +102,7 @@ adapter separation for explicit human approval. Only the plan's
```task
id: MASON-WP-0005-T04
status: todo
status: wait
priority: high
state_hub_task_id: "0e3d1333-ffc3-5f67-8528-50a9551c4949"
```
@ -122,7 +121,7 @@ a provisioner capability.
```task
id: MASON-WP-0005-T05
status: todo
status: wait
priority: high
state_hub_task_id: "4c205be7-4f1f-5dd1-aafa-fc112fdd640e"
```
@ -147,7 +146,7 @@ operator/platform flow and return metadata-only evidence to ops-mason.
```task
id: MASON-WP-0005-T06
status: todo
status: wait
priority: medium
state_hub_task_id: "09eae088-808d-5342-b100-292e13958ee3"
```
@ -163,3 +162,9 @@ The adapter lane is tracked separately as `MASON-IN-0003`, tied to
`redaction-salt`; it must be denied `operator-app` and `operator-session` and
must use the adapter's own runtime identity rather than this attended OIDC
role.
## Loose-end review — 2026-09-28
T01–T06 remain wait: accepted tenant/matrix, confirmed identity/MFA/callbacks, approved matching writer contracts, live survey, explicit construction approval and verification are outstanding. The platform design remains proposed. No lane was built or activated.
Evidence and precise resumption conditions: [review](../docs/evidence/2026-09-28-loose-end-review.md). Existing tasks retain all remaining obligations; no new task or workplan was opened.