diff --git a/workplans/ORGREF-WP-0001-foundation-and-entry-gate.md b/workplans/ORGREF-WP-0001-foundation-and-entry-gate.md index cd92286..0ee838c 100644 --- a/workplans/ORGREF-WP-0001-foundation-and-entry-gate.md +++ b/workplans/ORGREF-WP-0001-foundation-and-entry-gate.md @@ -9,7 +9,7 @@ flavor: implementation owner: codex topic_slug: railiance created: "2026-08-11" -updated: "2026-09-28" +updated: "2026-10-05" related_repos: - railiance-forge - railiance-platform @@ -35,6 +35,12 @@ The user authorized preparation on September 28. T01/T02 are `wait` after the bounded preparation below; their acceptance criteria are not yet met. T03 onward still requires all four gate conditions. +2026-10-05: T01 is wait on the authenticated-metadata decision +`5f3680fc-0cd5-4d27-ba39-59fbdd13313c`. T02 also waits on the stewardship +review `60c5767c-d510-4d13-9a24-d5d58485b7e5`. T03 and T04 wait on the +rollback-gate decision `e9aca79b-f167-4326-94cd-037dcea34cd2`. T05 waits on +T01–T04. None of these tasks started a forge change. + ## Entry gate — do not start T03 onward until all four hold 1. **Family declaration validator is live and green.** The rapp/rail/reef @@ -98,7 +104,10 @@ It must not: ```task id: ORGREF-WP-0001-T01 -status: todo +status: wait +needs_human: true +decision_id: 5f3680fc-0cd5-4d27-ba39-59fbdd13313c +blocking_reason: "The September 28 collector is not G1 acceptance. Authenticated metadata still waits on decision 5f3680fc, and an unchanged-fleet pair is still missing." priority: high state_hub_task_id: "4964bf8f-96eb-59f0-8a50-5ecb5c7dbc8f" ``` @@ -154,7 +163,9 @@ forgejo.coulomb.social/coulomb/core-hub` in `railiance-apps/charts/core-hub/valu id: ORGREF-WP-0001-T02 status: wait depends_on: [ORGREF-WP-0001-T01] -blocking_reason: "Taxonomy draws on the G1 inventory (T01)." +needs_human: true +decision_id: 60c5767c-d510-4d13-9a24-d5d58485b7e5 +blocking_reason: "The taxonomy draft waits on the G1 inventory (T01) and on stewardship review 60c5767c. The September 28 matrix is not acceptance." priority: high state_hub_task_id: "00d150ed-81dd-51ac-af7b-197900373cbe" ``` @@ -191,7 +202,11 @@ Naming and maintainer acceptance remain pending. ```task id: ORGREF-WP-0001-T03 -status: todo +status: wait +depends_on: [ORGREF-WP-0001-T01, ORGREF-WP-0001-T02] +needs_human: true +decision_id: e9aca79b-f167-4326-94cd-037dcea34cd2 +blocking_reason: "The August 11 production deferral remains in force. Throwaway forge behavior does not start while G1 and G2 are unaccepted and the rollback-gate decision is open." priority: high state_hub_task_id: "4b57ef3f-2a7c-56ff-b19d-e751b0b4685d" ``` @@ -209,7 +224,10 @@ time. ```task id: ORGREF-WP-0001-T04 -status: todo +status: wait +needs_human: true +decision_id: e9aca79b-f167-4326-94cd-037dcea34cd2 +blocking_reason: "Rollback proof cannot bootstrap its own prerequisite. Decision e9aca79b is still open, and the August 11 production deferral remains in force." priority: high state_hub_task_id: "a55d95e2-6014-5d84-ba6e-b178c3901f3e" ``` @@ -224,7 +242,9 @@ time. Unrelated application rollout rollback is not acceptable transfer proof. ```task id: ORGREF-WP-0001-T05 -status: todo +status: wait +depends_on: [ORGREF-WP-0001-T01, ORGREF-WP-0001-T02, ORGREF-WP-0001-T03, ORGREF-WP-0001-T04] +blocking_reason: "The cutover plan is written from T01–T04 evidence. Those tasks are still open." priority: medium state_hub_task_id: "3ad6090f-5aa9-5087-a670-37d7b2ffdb7c" ```