# Proposed amendment: allow the prerequisite proof to be produced Status: proposed; not enacted. Decision: `e9aca79b-f167-4326-94cd-037dcea34cd2`. ## Problem The standing rule requires all four entry conditions before T03/T04, while T04 was intended to produce condition 4. Unrelated application rollback receipts do not resolve this dependency. Moving the same experiment to another repo merely to evade the gate would not resolve it either. ## Exact proposed rule Replace the all-four prerequisite for the **disposable-only portions of T03/T04** with these conditions: 1. Entry conditions 1–3 are met and the evidence is accepted for the tested scope. 2. railiance-forge has a file-backed, separately authorized rehearsal record naming an isolated disposable instance, its product/version/configuration, fixtures, permitted operations, cleanup and rollback evidence. 3. The rehearsal uses no existing production org/repository/package, customer data or production credential grant. Its GitOps and image-pull consumer is a disposable fixture. Configuration differences from production are recorded. 4. Only disposable repo transfer/rename, package behavior and recovery are exercised. No existing repo is used merely because it seems low-stakes. 5. T03/T04 evidence may satisfy condition 4 only for behavior reproduced with equivalent relevant configuration; untested production-specific differences remain blockers. The forge owner signs off applicability. **All four entry conditions remain required before any production transfer, production rehearsal, or T05 execution.** G3/G4 still need accepted behavior and rollback evidence; production GitOps and fresh-pull acceptance remain required before migration completion. This amendment changes sequencing, not evidence quality or production authority. ## Files to change if accepted - AGENTS.md, “Before anything else”: keep the all-four production rule and add the exact disposable-only exception above for T03/T04. - ORGREF-WP-0001 entry gate: reference the exception and keep conditions 1–4. - T03/T04: distinguish disposable prerequisite proof from later production applicability verification; remove the requirement for prior condition-4 proof only from the disposable portion. - GOAL.md/history and State Hub decision: record the accepted amendment and its scope. Do not mark any gate green merely because this rule is accepted. ## Effect today None on execution readiness: conditions 2 and 3 still fail, and no owner rehearsal record/target has been authorized. Accepting this proposal alone would not permit any live action now. Until explicitly accepted, AGENTS.md and the original all-four rule remain unchanged.